LIGO-Number |
Title |
Author(s) |
Topic(s) |
Last Updated |
E1200392-v9 |
Initial Alignment Procedure - LBSC2 As Built |
Jason Oberling et al. |
Installation
|
10 Mar 2014 |
D1200640-v1 |
ALIGO, OPLEV BEAM SPLITTER TRANSCEIVER ASSEMBLY |
Eric James |
Final Design
|
18 Jul 2012 |
E1200031-x0 |
aLIGO Optical Levers Assembly and Installation Documents |
Eric James |
Integration
|
10 May 2017 |
T1100149-v15 |
Initial Alignment of the Vertex Hartmann Sensor |
Aidan Brooks et al. |
Auxiliary Optics
Installation
|
22 Sep 2015 |
T1000230-v7 |
Initial Alignment Subsystem (IAS), Final Design Document |
Scott Shankle et al. |
Final Design
Reviews
|
26 Mar 2015 |
E1100734-x0 |
Advanced LIGO Initial Alignment Procedures |
Douglas Cook et al. |
Installation
|
10 Mar 2015 |
E1200099-v4 |
aLIGO Chamber (Top Level) Installation Procedure: LHAM6 |
Eric James et al. |
Installation
|
12 Nov 2014 |
D1200962-v3 |
aLIGO AOS OpLev Passive Damping Assembly |
Eric James et al. |
Fabrication
|
05 Nov 2014 |
E1100690-v10 |
Initial Alignment Procedure - WBSC8 As Built |
Jason Oberling et al. |
Installation
|
11 Jun 2014 |
E1101071-v5 |
Initial Alignment Procedure - WBSC6 As Built |
Douglas Cook et al. |
Auxiliary Optics
Installation
|
05 Jun 2014 |
E1200795-v6 |
Initial Alignment Procedure - WBSC2 As Built |
Jason Oberling et al. |
Installation
|
02 Jun 2014 |
E1100784-v8 |
Initial Alignment Procedure - LHAM4 and LHAM5 As Built |
Ken Mason et al. |
Installation
|
23 May 2014 |
E1100783-v9 |
Initial Alignment Procedure - LHAM2 and LHAM3 As Built |
Douglas Cook et al. |
Installation
|
22 May 2014 |
E1200393-v6 |
Initial Alignment Procedure - LBSC3 As Built |
Jason Oberling et al. |
Installation
|
05 May 2014 |
E1200030-x0 |
aLIGO Optical Levers Final Design Documents |
Eric James |
Integration
|
25 Mar 2014 |
E1200495-x0 |
aLIGO, AOS, Optical Levers |
Eric James et al. |
Auxiliary Optics
|
25 Mar 2014 |
T080307-v6 |
Initial Alignment System (IAS) Design Requirements Document (DRD) |
Michael Smith et al. |
Final Design
Auxiliary Optics
|
03 May 2013 |
E1200450-v5 |
aLIGO Chamber (Top Level) Installation Procedure: WHAM3 |
Eric James |
Installation
|
23 Apr 2013 |
E1101072-x0 |
Initial Alignment Procedure -LHAM6 |
Douglas Cook et al. |
Installation
|
23 Apr 2013 |
E1100782-x0 |
Initial Alignment Procedure -LHAM1 |
Douglas Cook et al. |
Installation
|
23 Apr 2013 |
E1200836-v1 |
aLIGO Optical Lever Longitudinal-to-Angle Coupling Coefficients |
Peter Fritschel et al. |
Auxiliary Optics
|
20 Feb 2013 |
E1200025-v5 |
aLIGO Chamber (Top Level) Installation Procedure: LHAM3 |
Eric James et al. |
Installation
|
19 Feb 2013 |
E1101021-v4 |
AOS SLC ITM Elliptical Baffle Installation Procedure |
Michael Smith et al. |
Installation
Auxiliary Optics
|
14 Feb 2013 |
D1201126-v1 |
aLIGO, AOS, OpLev, BS Telescope Mount Base |
Eric James et al. |
Fabrication
Auxiliary Optics
|
15 Aug 2012 |
D1200073-v2 |
aLIGO Top Level Assembly Document for Optical Levers |
Eric James |
Final Design
|
30 Jul 2012 |
D1100626-v1 |
ALIGO, OPLEV, PERISCOPE, MDC ZL REDUCER (MODIFIED) |
Eduardo Sanchez et al. |
Final Design
Auxiliary Optics
Fabrication
|
18 Jul 2012 |
D1100833-v1 |
ALIGO, OPLEV, PERISCOPE, BSC2-L1 LAYOUT |
Eduardo Sanchez et al. |
Conceptual Design
Auxiliary Optics
|
18 Jul 2012 |
D1200071-v1 |
aLIGO OPLEV RX Pylon Assembly LH (SR3) |
Eric James |
Final Design
|
18 Jul 2012 |
D1200072-v1 |
aLIGO OPLEV RX Pylon Assembly RH (PR3) |
Eric James |
Final Design
|
18 Jul 2012 |
D1100617-v2 |
ALIGO AOS OPLEV PCB CARRIER |
Eduardo Sanchez et al. |
Final Design
Auxiliary Optics
Fabrication
|
18 Jul 2012 |
D1101392-v3 |
DLC ASSEMBLY |
Norris Kilpatrick |
Basic R&D
|
09 Jul 2012 |
D1200964-v1 |
aLIGO AOS OpLev Base Extension |
Eric James et al. |
Fabrication
Auxiliary Optics
Final Design
|
27 Jun 2012 |
C1202755-v1 |
SOW-aLIGO Optical Lever Transmitter and Transceiver Enclosures |
Eric James |
Fabrication
|
26 Apr 2012 |
D1100706-v1 |
ALIGO, AOS, MIRROR MT. PEDESTAL (HAM) |
Eduardo Sanchez et al. |
Auxiliary Optics
Final Design
Fabrication
|
01 May 2012 |
C1202756-v1 |
SOW-aLIGO Optical Lever Enclosure Reducers |
Eric James |
Fabrication
|
25 Apr 2012 |
C1201797-v3 |
SOW-aLIGO Photon Calibrator TX Pylon Weldments |
Eric James et al. |
Fabrication
|
02 Apr 2012 |
E1200246-x0 |
DCN for OpLev Transceiver Telescope Spacer |
Eric James |
Fabrication
|
28 Feb 2012 |
D1200332-v1 |
aLIGO OPTICAL LEVERS GIRAFFE BASE TEMPLATE |
Scott Shankle et al. |
Fabrication
|
24 Feb 2012 |
C1105140-v4 |
Statement of Work, OpLev Periscopes |
Eric James |
Fabrication
|
13 Jul 2011 |
G1100444-v2 |
AOS OpLev Technical Talk aLIGO NSF Review 25-27 April 2011 |
Eric Gustafson et al. |
Reviews
NSF
Auxiliary Optics
|
05 May 2011 |
D1001620-v3 |
aLIGO AOS OPLEV SENSOR BRACKET |
Craig Conley et al. |
Fabrication
Final Design
Auxiliary Optics
|
03 May 2011 |