Refer to bug #905 -- https://services.ligo-wa.caltech.edu/integrationissues/show_bug.cgi?id=905
It also Incorporates Added Uwash Rotation sensor as per D1400243 & E1400262
D1300265-v2:
UPDATED TO SHOW LOCATION OF T240 seismometer (temporary STS-2 replacements)
removed unnecessary notes
Updated drawing title, was: aLIGO, SYSTEMS, LLO X-END STATION EXTERNAL VE LAYOUT
ADDED T240 seismometer (temporary STS-2 replacements)
removed unnecessary notes
Updated dangling dims.
Updated BOM (see previous rev for 'was' condition)
Removed unnecessary notes
Added NEW SHEET 2
RELOCATED LEFT SIDE VIEW + ELEVATION VIEW TO SHEET 2
ADDED NEW SHEET 3
Updated BOM as follows:
Added T240 seismometer (temporary STS-2 replacements)
Removed unnecessary notes
Updated BOM as follows:
ADDED T240 seismometer (temporary STS-2 replacements)
Added Uwash Rotation sensor as per D1400243
Removed unnecessary notes
Corrected Typos in multiple locations
Added new sheet no. 2
Updated related docs.
Updated BOM as follows:
Added T240 seismometer (temporary STS-2 replacements)
Removed unnecessary notes