LIGO Document P2600022-v1
- This workshop was the third in a series that began in 2019 to investigate the scientific and technical problems associated with the design, fabrication and operation of the large, multi-kilometre long, large diameter ( ~1m ) ultrahigh vacuum beamtubes that are required for the present generation and next generation gravitational wave observatories.
-
- PDF (BTW3 Summary Report_rev3_final.pdf, 1.1 MB)
- BTW3 held from 30 Sep 2025 to 02 Oct 2025 in LIGO Hanford
DCC Version 3.5.2, contact
DCC Help