Document List by Author

Cbi of Unknown Institution is listed as an author on the following documents:

LIGO-Number Title Author(s) Topic(s) Last Updated
C950384-x0 Beam Tube Module Qualification Test Review Data Package (CDRL #16, DRD #10 Items 1 & 2) and Design Qualification Test Report (CDRL #11, DRD #5) Cbi Document Migration
16 Sep 2020
C1900321-v1 Final Design Review Data Package, Beam Tube Module: CDRL 09, DRD 04, Draft Detailed Design Cbi Vacuum
Final Design
21 Oct 2019
D950036-x0 LIGO Beam Tube - Beam Tube Fixed Support, Plan View and Details Cbi Document Migration
14 May 2018
C962280-x0 Coupon Outgassing Test Data, Heat 11L855, Material Code "C" (CDRL 30-C-1, DRD 09) Cbi et al. Document Migration
27 Mar 2018
C930063-x0 CBI Beam Tube Module Design and Qualification Test: Preliminary Design Review Data Package (DRD #8) Cbi et al. Document Migration
15 Feb 2018
C950498-x0 Quality Assurance Manual to ANSI/ASQC Standard Q9001, Revision 7, dated 18 March 1998 R Shelton et al. Document Migration
18 Jan 2018
D961267-x0 Support Locations for Hanford Modules HX1 and HY1 for LIGO Beam Tube Cbi Document Migration
15 May 2014
D950043-x0 Section Details, Beam Tube Guided Support - Hanford and Livingston Cbi Document Migration
14 May 2014
D950042-x0 Elevation, Beam Tube Guided Support - Hanford and Livingston Cbi Document Migration
14 May 2014
D950038-x0 Sub-Assemblies H, J, K, & L - LIGO Beam Tube Modules - Hanford and Livingston Cbi Document Migration
14 May 2014
D980519-x0 Tube Secondary Seal Assembly Cbi Document Migration
25 Apr 2014
D980231-x0 Tube Secondary Seal Assembly Cbi Document Migration
25 Apr 2014
D980230-x0 Termination, Weather Protection Enclosure Cbi Document Migration
25 Apr 2014
D961407-x0 LIGO Beam Tube - Pump Port Isolation Valve - Hanford & Livingston Cbi Document Migration
16 Apr 2014
D950083-x0 Pieces, Vacuum Port, Leak Test Box Cbi Document Migration
02 Apr 2014
D950082-x0 Vacuum Port, Leak Test Box Cbi Document Migration
02 Apr 2014
D950081-x0 He Mass Spectrometer Test Arrangement Cbi Document Migration
02 Apr 2014
D950080-x0 Circumferential Leak Test Box (Formerly ER-123) Cbi Document Migration
02 Apr 2014
D950079-x0 Circumferential Leak Test Box (Formerly ER-122) Cbi Document Migration
02 Apr 2014
D950078-x0 Protective End Cap Cbi Document Migration
02 Apr 2014
D950077-x0 Cold Trap End Seal, Cold Trap Evacuation Line Subassembly, Interspace Vacuum Pump Line Subassembly - Leak Test Arrangement Cbi Document Migration
02 Apr 2014
D950076-x0 Cold Trap End Seal, Cold Trap Line Subassembly - Leak Test Arrangement Cbi Document Migration
02 Apr 2014
D950075-x0 Cold Trap End Seal, Lifting Frame Subassembly - Leak Test Arrangement Cbi Document Migration
02 Apr 2014
D950074-x0 Cold Trap Seal End, End Cap Assembly - Leak Test Arrangement Cbi Document Migration
02 Apr 2014
D950073-x0 Cold Trap End Seal, Rolling Base Subassembly - Leak Test Arrangement Cbi Document Migration
02 Apr 2014
D950072-x0 Cold Trap Seal End, Carriage Subassembly - Leak Test Arrangement Cbi Document Migration
02 Apr 2014
D950071-x0 Cold Trap End Seal Assembly - Leak Test Arrangement Cbi Document Migration
02 Apr 2014
D950070-x0 Cold Trap End Seal - Leak Test Arrangement Cbi Document Migration
02 Apr 2014
D950069-x0 Vacuum Pump End Seal, Interspace Vacuum Pump Line Subassembly, Sensors Connection Subassembly - Leak Test Arrangement Cbi Document Migration
02 Apr 2014
D950068-x0 Vacuum Pump End Seal, Cross-Over Line Subassembly - Leak Test Arrangement Cbi Document Migration
02 Apr 2014
D950067-x0 Vacuum Pump End Seal, Diffusion Pump Line Subassembly - Leak Test Arrangement Cbi Document Migration
02 Apr 2014
D950066-x0 Mechanical Vacuum Pump Line Subassembly - Leak Test Arrangement Cbi Document Migration
02 Apr 2014
D950065-x0 Vacuum Pump End Seal, Lifting Frame Subassembly - Leak Test Arrangement Cbi Document Migration
02 Apr 2014
D950064-x0 Vacuum Pump End Seal, End Cap Subassembly - Leak Test Arrangement Cbi Document Migration
02 Apr 2014
D950063-x0 Vacuum Pump End Seal, Rolling Base Subassembly - Leak Test Arrangement Cbi Document Migration
02 Apr 2014
D950062-x0 Vacuum Port End Seal, Carriage Subassembly - Leak Test Arrangement Cbi Document Migration
02 Apr 2014
D950061-x0 Vacuum Pump End Seal Assembly - Leak Test Arrangement Cbi Document Migration
02 Apr 2014
D950060-x0 Vacuum Pump End Seal - Leak Test Arrangement Cbi Document Migration
02 Apr 2014
D950059-x0 Helium Hood Enclosure Equipment - Leak Test Arrangement Cbi Document Migration
02 Apr 2014
D950058-x0 Saddle and Hinge Details - Leak Test Arrangement Cbi Document Migration
02 Apr 2014
D950057-x0 Saddle and Hinge, Helium Hood - Leak Test Arrangement Cbi Document Migration
02 Apr 2014
D950056-x0 Hood Test Enclosure, Helium Hood Details - Leak Test Arrangement Cbi Document Migration
02 Apr 2014
D950055-x0 Standard Hood Test Enclosure, Bottom Section - Leak Test Arrangement Cbi Document Migration
02 Apr 2014
D950054-x0 Standard Hood Test Enclosure, Top Section - Leak Test Arrangement Cbi Document Migration
02 Apr 2014
D950053-x0 Helium Hood, Leak Test Station - Leak Test Arrangement Cbi Document Migration
02 Apr 2014
D950052-x0 Leak Test Station, Isometric View - Leak Test Arrangement Cbi Document Migration
02 Apr 2014
D950049-x0 Transport and Handling Frame for Unstiffened Tube Sections Cbi Document Migration
02 Apr 2014
D950047-x0 Cross Section of Truck Loading for Shipment of Unstiffened Tube Sections Cbi Document Migration
02 Apr 2014
D950046-x0 Fabrication Shop Top View at Stiffener Fit and Weld Station Cbi Document Migration
02 Apr 2014
D950045-x0 Support Leveling, Beam Tube Fixed and Guided Support - Hanford and Livingston Cbi Document Migration
02 Apr 2014
G960283-x0 Hanford Fabrication Facility at Big Pasco - Viewgraph Cbi Document Migration
14 Mar 2014
C950501-x0 Material Traceability Cbi Document Migration
26 Feb 2013
D961302-x0 LIGO Beam Tube - Pump Port Hardware Type "B" Plan "A" Cbi Document Migration
25 Feb 2013
D960511-x0 LIGO Beam Tube - Gate Valve Soft Support - Hanford & Livingston Cbi Document Migration
25 Feb 2013
D960512-x0 LIGO Beam Tube - Beam Tube Termination Support - Hanford & Livingston Cbi Document Migration
25 Feb 2013
D950044-x0 LIGO Beam Tube - Beam Tube Guided Support - Hanford & Livingston Cbi Document Migration
25 Feb 2013
D950037-x0 LIGO Beam Tube - Beam Tube Fixed Support, Support Lug Assembly and Section Details Cbi Document Migration
25 Feb 2013
D950035-x0 LIGO Beam Tube - Beam Tube Fixed Support, Elevation Cbi Document Migration
25 Feb 2013
D950031-x0 LIGO Beam Tube - Beam Tube Modules - Hanford & Livingston Cbi Document Migration
25 Feb 2013
D960510-x0 LIGO Beam Tube - General Notes Cbi Document Migration
25 Feb 2013
D970062-x0 LIGO Beam Tube - Pump Port Isolation Valve Cbi Document Migration
29 Jan 2013
D970060-x0 LIGO Beam Tube - Tube Section Leak Test, Pump Port Nozzle and Valves Cbi Document Migration
29 Jan 2013
D970059-x0 LIGO Beam Tube - Tube Section Leak Test, Pump Port Leak Test Fixture Cbi Document Migration
29 Jan 2013
D970058-x0 LIGO Beam Tube - Tube Section Leak Test, Pump Port Leak Test Fixture Cbi Document Migration
28 Jan 2013
D970057-x0 Large Optic Suspension (LOS) Assembly (LOS1e) for Recycling Mirror, 2K (1 RM, 2K) Janeen Hazel et al. Document Migration
28 Jan 2013
D970056-x0 LIGO Beam Tube - Circumferential Leak Test Box, Hinge Details Cbi Document Migration
28 Jan 2013
D970055-x0 LIGO Beam Tube - Circumferential Leak Test Box, Hinge Details Cbi Document Migration
28 Jan 2013
D970054-x0 LIGO Beam Tube - Circumferential Leak Test Box, Clamping Details Cbi Document Migration
28 Jan 2013
D970053-x0 LIGO Beam Tube - Circumferential Leak Test Box, General View Cbi Document Migration
28 Jan 2013
D961300-x0 LIGO Beam Tube - Tube Section End Covers Cbi Document Migration
28 Jan 2013
D961299-x0 LIGO Beam Tube - Cleaning Room Equipment, Tube Support Points Cbi Document Migration
28 Jan 2013
D961205-x0 LIGO Beam Tube - Cleaning Room Equipment, Tube Support Points Cbi Document Migration
28 Jan 2013
D961204-x0 LIGO Beam Tube - Cleaning Room Equipment, Tube Support Points Cbi Document Migration
28 Jan 2013
D960807-x0 LIGO Beam Tube - Cleaning Room Equipment, Fluid Tilting Extension Cbi Document Migration
28 Jan 2013
D960806-x0 LIGO Beam Tube - Cleaning Room Equipment, Fluid Catch Basin Cbi Document Migration
28 Jan 2013
D960519-x0 LIGO Beam Tube - Cleaning Room Equipment, Tube Section Support Cbi Document Migration
28 Jan 2013
D960518-x0 LIGO Beam Tube - Cleaning Room Equipment, Tube Section Support Cbi Document Migration
28 Jan 2013
D960517-x0 LIGO Beam Tube - Cleaning Room Equipment, General Tube Section Layout Cbi Document Migration
28 Jan 2013
D960516-x0 LIGO Beam Tube - Beam Tube Section Cleaning, Extension Assembly Cbi Document Migration
28 Jan 2013
D960515-x0 LIGO Beam Tube - Beam Tube Section Cleaning, Spraying Apparatus Cbi Document Migration
28 Jan 2013
D960514-x0 LIGO Beam Tube - Beam Tube Assembly, Cleaning Room Equipment Layout Cbi Document Migration
28 Jan 2013
D970052-x0 LIGO Beam Tube - Wiring Schematic, Distribution Panel #1, Circuit "C" D I/O Control - "C" System Cbi Document Migration
28 Jan 2013
D970051-x0 LIGO Beam Tube - Wiring Schematic, Distribution Panel #1, Circuit "B" D I/O Control - "B" System Cbi Document Migration
28 Jan 2013
D970050-x0 LIGO Beam Tube - Wiring Schematic, Distribution Panel #1, Circuit "A" D I/O Control - "A" System Cbi Document Migration
28 Jan 2013
D970049-x0 LIGO Beam Tube - Wiring Schematic, Distribution Panel #1, Circuit "D" & Casket Hood Vacuum Pump Skid Cbi Document Migration
28 Jan 2013
D970048-x0 LIGO Beam Tube - Section Test System Analog I/O Wiring Diagram Cbi Document Migration
28 Jan 2013
D970047-x0 LIGO Beam Tube - Section Test Skid D I/O Wiring Diagram for Skid "C" Cbi Document Migration
28 Jan 2013
D970046-x0 LIGO Beam Tube - Section Test Skid D I/O Wiring Diagram for Skid "B" Cbi Document Migration
28 Jan 2013
D970045-x0 LIGO Beam Tube - Section Test Control Room, 120 VAC Supply Diagram Cbi Document Migration
28 Jan 2013
D970044-x0 LIGO Beam Tube - Section Test Control Room D I/O Distribution Panel Wiring Cbi Document Migration
28 Jan 2013
D970043-x0 LIGO Beam Tube - Casket Hood Skid Junction Box Wiring Cbi Document Migration
28 Jan 2013
D970042-x0 LIGO Beam Tube - Section Test D I/O Wiring Diagram for Skid "A" Cbi Document Migration
28 Jan 2013
D970041-x0 LIGO Beam Tube - Section Test D I/O Junction/Card and Distribution Panel Layout Cbi Document Migration
25 Jan 2013
D970040-x0 LIGO Beam Tube - Section Test Skid Junction Box Layout Cbi Document Migration
25 Jan 2013
D970039-x0 LIGO Beam Tube - Section Test System Power Single Line Diagram Cbi Document Migration
25 Jan 2013
D970038-x0 LIGO Beam Tube - Vacuum Test System Electrical Block Diagram Cbi Document Migration
25 Jan 2013
D970037-x0 LIGO Beam Tube - Tube Section Leak Test Pump System, Pump End (Side View) Cbi Document Migration
25 Jan 2013
D970036-x0 LIGO Beam Tube - P & I Diagram, Vacuum Systems, Fabrication Facility Nitrogen Supply System Cbi Document Migration
25 Jan 2013
D970035-x0 LIGO Beam Tube - P & I Diagram, Vacuum Systems, Helium Supply System Cbi Document Migration
25 Jan 2013
D970034-x0 LIGO Beam Tube - P & I Diagram, Vacuum Systems, Tube Section Leak Test Hood Systems Cbi Document Migration
25 Jan 2013
D970033-x0 LIGO Beam Tube - P & I Diagram, Vacuum Systems, Tube Section Leak Test Pump System Cbi Document Migration
25 Jan 2013
D970032-x0 LIGO Beam Tube - Tube Section Leak Test, Spreader Bar and Casket Seal Cbi Document Migration
25 Jan 2013
D970031-x0 LIGO Beam Tube - Tube Section Leak Test, Casket Alignment Pins and Lugs Cbi Document Migration
25 Jan 2013
D970030-x0 LIGO Beam Tube - Tube Section Leak Test, Head Nozzles Cbi Document Migration
25 Jan 2013
D970029-x0 LIGO Beam Tube - Tube Section Leak Test, Frame Drive and Balance Lug Cbi Document Migration
25 Jan 2013
D970028-x0 LIGO Beam Tube - Tube Section Leak Test, Frame Balance Beams and Miscellaneous Cbi Document Migration
25 Jan 2013
D970027-x0 LIGO Beam Tube - Tube Section Leak Test, Frame and Track Details Cbi Document Migration
25 Jan 2013
D970026-x0 LIGO Beam Tube - Tube Section Leak Test, Frame Wheels & Elbow Cbi Document Migration
25 Jan 2013
D970025-x0 LIGO Beam Tube - Tube Section Leak Test, Blind End Head Supports Cbi Document Migration
25 Jan 2013
D970024-x0 LIGO Beam Tube - Tube Section Leak Test, Pump End Equipment Supports Cbi Document Migration
25 Jan 2013
D970023-x0 LIGO Beam Tube - Tube Section Leak Test, Pump End Frame Cbi Document Migration
25 Jan 2013
D970022-x0 LIGO Beam Tube - Tube Section Leak Test, Pump End Frame & Equipment Cbi Document Migration
25 Jan 2013
D970021-x0 LIGO Beam Tube - Tube Section Leak Check, Head Details Cbi Document Migration
25 Jan 2013
D970020-x0 LIGO Beam Tube - Tube Section Leak Test, Casket & Head Seals Cbi Document Migration
25 Jan 2013
D970019-x0 LIGO Beam Tube - Tube Section Leak Test, Tube Supports Cbi Document Migration
25 Jan 2013
D970018-x0 LIGO Beam Tube - Tube Section Leak Test, Tube Supports Cbi Document Migration
25 Jan 2013
D970017-x0 LIGO Beam Tube - Tube Section Leak Test, Casket Supports Cbi Document Migration
25 Jan 2013
D970016-x0 LIGO Beam Tube - Tube Section Leak Test, Casket Supports Cbi Document Migration
25 Jan 2013
D950087-x0 Elevation View of Tube Installation Cbi Document Migration
25 Jan 2013
D950086-x0 Fit-Up Welding and Leak Testing Configurations at Guide Supports Cbi Document Migration
25 Jan 2013
D950085-x0 Fit-Up Welding and Leak Testing Configurations at Fixed Supports Cbi Document Migration
25 Jan 2013
D950084-x0 Pump Port Welding Jig and Repair Jack Cbi Document Migration
25 Jan 2013
D950051-x0 Fit Up Clamp Details Cbi Document Migration
25 Jan 2013
D950050-x0 Fit Up Clamp Cbi Document Migration
25 Jan 2013
D950048-x0 Elevation of Truck Loading for Unstiffened Tube Shipment Cbi Document Migration
25 Jan 2013
D961301-x0 LIGO Beam Tube - Portable Calibration Module Plan "E" Cbi Document Migration
25 Jan 2013
D961303-x0 LIGO Beam Tube - Pump Port Hardware Type "H" - Hanford & Livingston Cbi Document Migration
25 Jan 2013
D960513-x0 LIGO Beam Tube - Termination Support Ring Details - Hanford & Livingston Cbi Document Migration
24 Jan 2013
D950041-x0 LIGO Beam Tube - Support Rings, Fixed, Guided and Termination Supports - Hanford & Livingston Cbi Document Migration
24 Jan 2013
D950040-x0 LIGO Beam Tube - Vacuum Stiffener Details - Hanford & Livingston Cbi Document Migration
24 Jan 2013
D950039-x0 Pump Port Drawing and Specifications - CDRL #24-11, DRD #03 Cbi Document Migration
24 Jan 2013
D950034-x0 LIGO Beam Tube - Sub Assemblies A, B, C, D, E, F, G, H, I, J, K, L, M, N, O, P, Q, R, S, Rev. 07 Cbi Document Migration
24 Jan 2013
D950033-x0 LIGO Beam Tube - Support Locations for Hanford and Livingston Modules Cbi Document Migration
24 Jan 2013
D950032-x0 LIGO Beam Tube - Sub-Assembly End Locations for Hanford and Livingston Modules Cbi Document Migration
24 Jan 2013
E980336-x0 Adjustment of Fixed and Guided Supports Cbi Document Migration
20 Jun 2012
E980072-x0 Pump Port Hardware to Vacuum Equipment, Rev. 03 Cbi Document Migration
19 Jun 2012
E970186-x0 Macro Examination of Spiral Welds for Full Tension Cbi Document Migration
19 Jun 2012
E970185-x0 Special Cleaning of Beam Tube Can Sections Cbi Document Migration
19 Jun 2012
E970033-x0 Fabrication/Installation Procedure - Beam Tube Interface with the Beam Tube Slab, Beam Tube Enclosure and Baffles Cbi Document Migration
14 Jun 2012
E970028-x0 Leak Testing Procedure - Helium Mass Spectrometer Hood Test of Beam Tube Sections (with Hood Bags) Cbi Document Migration
14 Jun 2012
E970027-x0 Procedure for Obtaining a Cleanliness Assessment Sample Cbi Document Migration
14 Jun 2012
E970025-x0 Fabrication/Installation Procedure - Beam Tube and Termination Support to Gate Valve and Termination Foundation Cbi Document Migration
14 Jun 2012
E970021-x0 Liquid Nitrogen Trap Specification Cbi Document Migration
14 Jun 2012
E970013-x0 Residual Gas Analyzer Specification Cbi Document Migration
14 Jun 2012
E970012-x0 Pump Port "H" Hardware Specification Cbi Document Migration
14 Jun 2012
E950073-x0 Initial and Final Alignment During Installation of LIGO Beam Tube Modules Using GPS System, Rev. 09 Cbi et al. Document Migration
12 Jun 2012
E950068-x0 Leak Testing Procedure - Helium Mass Spectrometer Hood Test of Pump Ports with Valve, Rev. 06 Marty Tellalian et al. Document Migration
12 Jun 2012
E950067-x0 Leak Testing Procedures - Helium Mass Spectrometer Hood Test of Closing Weld Joints Between Beam Tube Sections Cbi et al. Document Migration
12 Jun 2012
E950066-x0 Leak Testing Procedure - Helium Mass Spectrometer Hood Test of Beam Tube Sections Cbi et al. Document Migration
12 Jun 2012
E950065-x0 Clean Room Wearing Apparel for Beam Tube Access during Construction Inspection Activity, Rev. 03 Cbi et al. Document Migration
12 Jun 2012
E950063-x0 Contamination Control for Construction Activities During Beam Tube Installation, Rev. 04 Cbi et al. Document Migration
12 Jun 2012
E950052-x0 Fitting/Purge Procedure for Pump Port Attachment Welds, Rev. 06 Cbi et al. Document Migration
12 Jun 2012
E950051-x0 Fitting/Purge Procedure for Stiffener Attachment Welds, Rev. 06 Cbi et al. Document Migration
12 Jun 2012
E950050-x0 Fitting/Purge Procedure for Circumferential Butt Welds, Rev. 06 Cbi et al. Document Migration
12 Jun 2012
E950049-x0 Beam Tube Can Section Installation Sequence, Rev. 07 Cbi et al. Document Migration
12 Jun 2012
E950030-x0 Pump Port Fabrication Specification Cbi et al. Document Migration
12 Jun 2012
E950062-v1 Cleaning of Beam Tube Can Modules Dennis Coyne Vacuum
Fabrication
27 Oct 2009
D980518-x0 Termination Weather Protection Enclosure Cbi et al. Document Migration
05 Nov 1998
G980110-x0 LIGO - Shop & Field of Beam Tube Fabrication and Installation, CBI Video Cbi Document Migration
22 Jul 1998

Number of documents found: 159


DCC Version 3.5.0, contact DCC Help