Documents from Last 2 Days

These documents have been modified in the last 2 days.

modified in the last days.

LIGO-Number Title Author(s) Topic(s) Last Updated
D1201496-v7 Optical Table Feedthrough Panel Layout: SQZT0 Daniel Sigg Sensing and Control
24 Sep 2020
E1400021-v7 Fiber Profile Data Summary Table Angus Bell et al. Suspensions
07 Apr 2014
E1200613-x0 Patch Panels for Table Enclosures Rich Abbott Sensing and Control
Final Design
24 Sep 2020
D2000460-v1 Fiber Coupler Patch Panel for Squeezer OPO/CLF/FC Daniel Sigg Squeezer
24 Sep 2020
F0900037-v2 LIGO Operations Change Request Form Dennis Coyne Operations Business
23 Jan 2013
G030226-v1 Evaluation of EPI Approaches Dennis Coyne Seismic Isolation
Reviews
24 Sep 2020
M2000231-x0 Documents for the External Pre-Isolator (EPI) review of April 2003 Brian Lantz Seismic Isolation
Reviews
24 Sep 2020
T030077-v1 Control and Performance of the Hydraulic External Pre-Isolator at LASTI Brian Lantz et al. Seismic Isolation
Basic R&D
24 Sep 2020
G2001733-v1 Magnetic External Pre-Isolator Richard Mittleman et al. Seismic Isolation
Reviews
24 Sep 2020
G030229-v1 EPI Plan & Schedule Dennis Coyne Seismic Isolation
Reviews
24 Sep 2020
G030227-v1 HEPI presentation for EPI Review Brian Lantz et al. Seismic Isolation
Reviews
24 Sep 2020
E1201099-x0 DCN for ISC/IO optical table feedthroughs Daniel Sigg Input Optics
Sensing and Control
24 Sep 2020
E2000502-x0 aLIGO, SQZ, 105 kHz QPD Rich Abbott A+
Squeezer
24 Sep 2020
E1600390-x0 aLIGO, SQZ, Photodetectors and Sensors Daniel Sigg Squeezer
24 Sep 2020
E1900095-v1 LTREX Project Dennis Coyne Vacuum
24 Sep 2020
G030460-v1 DC Readout for Advanced LIGO Peter Fritschel Sensing and Control
24 Sep 2020
E1600073-v5 DR isotherm experiment procedure Jon Feicht Modelling
Vacuum
24 Sep 2020
T1300642-v1 Sapphire Prism bond test: Results GariLynn Billingsley et al. System Engineering
Activity
Suspensions
23 Sep 2020
T2000425-v6 LSC EPO White Paper and Executive Summary 2020-21 Martin Hendry Education, Outreach
23 Sep 2020
D1700308-v7 Squeezer In-vacuum Controls Wiring Chain Rich Abbott Squeezer
14 Mar 2018
D1700316-v1 Squeezer 25-pin D-sub In-vacuum Cable Rich Abbott Squeezer
23 Sep 2020
D1700439-v1 Squeezer OPO TEC and Thermistor Cable Rich Abbott Squeezer
13 Sep 2017
T030074-v1 External Pre-Isolation (EPI) Evaluation Dennis Coyne Seismic Isolation
Reviews
23 Sep 2020
M2000130-v4 LSC 2020-21 Program Stephen Fairhurst et al. Operations
Collaboration
Detector
Data Analysis
23 Sep 2020
G030196-v1 An Overview of External Pre-Isolation (EPI) Brian Lantz Seismic Isolation
22 Sep 2020
P050031-v1 Quiet Hydraulic Actuators for LIGO C Hardham Document Migration
17 Sep 2020

Number of documents found: 26


DCC Version 3.3.0, contact Document Database Administrators