Document List by Author

Matthew Heintze of LIGO - Livingston Observatory is listed as an author on the following documents:
(List events moderated by Matthew Heintze)

LIGO-Number Title Author(s) Topic(s) Last Updated
T1700046-x0 neoLASE 70W amplifier for LIGO Matthew Heintze et al. Laser Systems
10 Jun 2024
E1200590-x0 aLIGO, IOO, Suspended Optics Guido Mueller et al. Input Optics
25 Apr 2024
D1400238-x0 TCS CO2 Laser Power Supply Interlock Box David Kinzel Laser Systems
Installation
17 Jul 2014
M1000228-v1 LLO Laser Safety Plan David Kinzel et al. Safety
Laser Systems
09 May 2014
E1201035-v25 aLIGO Chamber Entry & Exit Procedures Calum Torrie et al. System Engineering
Safety
27 Mar 2023
T0900614-v1 aLIGO PSL Safety Plan Peter King Laser Systems
Safety
21 Sep 2016
T0900559-v26 HLTS/HSTS/OMCS Blade Pairings Norna Robertson et al. Suspensions
Final Design
08 Mar 2015
E2100150-v1 HAM-8 FTIR Mapping Adam Branch et al. A+
Vacuum
26 Apr 2021
E2100134-v7 LLO HAM7 chamber: Raman, XRF and next round of FTIR Results Matthew Heintze A+
Vacuum
05 May 2021
T0900386-v7 Advanced LIGO Input Optics Final Design Document David Tanner et al. Final Design
Input Optics
18 Mar 2021
E0900047-v23 LIGO Contamination Control Plan Betsy Weaver et al. Cleaning
Observatory Facilities
Risk Management
17 Sep 2020
E1900307-v2 aLIGO FTIR sample record of LLO Oct Vent TMsx Shroud assembly baffles Matthew Heintze System Engineering
Installation
30 Sep 2019
E1200586-x0 aLIGO, IO, Opto-Mechanical Layouts Guido Mueller et al. Input Optics
26 Aug 2019
T1800253-v1 LCP-4 (cryo-trap) Internal Photos (Livingston) Scott McCormick et al. System Engineering
Operations
Vacuum
Quality Assurance
09 Jul 2018
E1200592-x0 aLIGO, IOO, IMC Guido Mueller et al. Input Optics
02 May 2018
E1200594-x0 aLIGO, IOO, EOM Guido Mueller et al. Input Optics
21 Apr 2018
E1800073-v1 FTIR: LLO Bonnet Plate Matthew Heintze et al. System Engineering
Vacuum
29 Mar 2018
E1300308-x0 Input Mode Cleaner Testing Documentation Guido Mueller et al. Reviews
Input Optics
11 Dec 2017
E1500012-v2 ECR: Move IO input beam PZT-mount from periscope to PSL/IO table surface Peter Fritschel et al. Input Optics
17 Jul 2017
E1300588-v2 HAUX H1-IM4 test report Guido Mueller et al. Input Optics
Subsystem Test
03 Oct 2016
E1300587-v2 HAUX H1-IM3 test report Guido Mueller et al. Input Optics
Subsystem Test
03 Oct 2016
E1300585-v2 HAUX H1-IM1 test report Guido Mueller et al. Input Optics
Subsystem Test
03 Oct 2016
E1300591-v3 HAUX L1-IM3 test report Guido Mueller et al. Subsystem Test
Input Optics
03 Oct 2016
E1300592-v2 HAUX L1-IM4 test report Guido Mueller et al. Subsystem Test
Input Optics
03 Oct 2016
E1300590-v2 HAUX L1-IM2 test report Guido Mueller et al. Input Optics
Subsystem Test
03 Oct 2016
E1300589-v2 HAUX L1-IM1 test report Guido Mueller et al. Input Optics
Subsystem Test
03 Oct 2016
T1500492-v1 Information regarding the two failed PSL Pre-mode cleaners (PMC's) at LLO Matthew Heintze Laser Systems
21 Sep 2016
E1600169-x0 HAM Auxiliary suspensions design and testing documentation Giacomo Ciani et al. Input Optics
03 Jun 2016
G1501377-v1 Photos from LLO control room of Neil deGrasse Tyson visit Matthew Heintze Education, Outreach
14 Nov 2015
E1200343-v96 OSEM Chart Stuart Aston et al. Suspensions
Assembly
Subsystem Test
22 Oct 2015
E1500261-v1 Waiver request: Class B cleaning of OMC black glass assy. shims (D1500183) Matthew Heintze Vacuum
Sensing and Control
System Engineering
08 Jun 2015
E1200584-x0 aLIGO, IOO Guido Mueller et al. Input Optics
12 May 2015
L1400006-x0 Fabrication Acceptance Review Documents and Status David Shoemaker et al. Reviews
Detector
06 May 2015
T1500124-v1 3IFO IO Cross Check and Custody Jodi Fauver et al. Input Optics
25 Mar 2015
E1500123-v2 Fabrication Acceptance Review Status of Input Optics EOM Testing, Modeling and Discussion of need for Waivers from Systems Christopher Guido et al. Reviews
Input Optics
11 Mar 2015
Q1500006-v1 Waiver: no elevated temperature bake of adhesive for PR3 IM Matthew Heintze System Engineering
Suspensions
Quality Assurance
Vacuum
11 Mar 2015
E1000169-v20 SUS HAM Production Blades - Characterization Spreadsheet Janeen Romie et al. Suspensions
Fabrication
08 Mar 2015
P1400105-v5 Achieving Resonance in the Advanced LIGO Gravitational-Wave Interferometer Alexa N Staley et al. Basic R&D
Integration
Sensing and Control
05 Mar 2015
E1201013-v2 aLIGO Input Optics Acceptance Documentation Giacomo Ciani et al. Reviews
Input Optics
22 Apr 2014
T1300466-x0 IO Faraday Isolator Assembly Procedures Guido Mueller et al. Reviews
Input Optics
25 Dec 2013
T1300123-x0 IO Faraday Isolator Requirements and Design Guido Mueller et al. Reviews
Input Optics
25 Dec 2013
T1300636-v1 aLIGO TMS LBSC4 Primary Mirror Mounting Ken Mailand et al. Basic R&D
Auxiliary Optics
18 Jul 2013
E1300471-v1 ECR: Reposition the Vibration Absorbers Attached to the Output Faraday Isolator (OFI) Assembly Matthew Heintze Auxiliary Optics
Installation
Change Control
21 May 2013
T1100003-v7 Building Suspension Subassemblies in ICS Dwayne Giardina et al. Assembly
Suspensions
16 Apr 2013
E1200589-x0 aLIGO, IOO, Baffles Guido Mueller et al. Input Optics
26 Feb 2013
E1200585-x0 aLIGO, IOO, System Overview Guido Mueller et al. Input Optics
29 Jan 2013
E1200587-x0 aLIGO, IOO, Optical Components and Assemblies Guido Mueller et al. Input Optics
05 Jun 2012
E1200593-x0 aLIGO, IOO, FI Guido Mueller et al. Input Optics
05 Jun 2012
E1200591-x0 aLIGO, IOO, Non-Suspended Optics Guido Mueller et al. Input Optics
05 Jun 2012
G1100491-v4 IO Input Optics Technical Status David Reitze et al. Input Optics
Reviews
30 Apr 2011
T0900486-v5 IO Stray Light Analysis and Baffle Design Guido Mueller et al. Final Design
Input Optics
15 Feb 2011

Number of documents found: 51


DCC Version 3.5.0, contact DCC Help