LIGO-Number |
Title |
Author(s) |
Topic(s) |
Last Updated |
D1001895-v7 |
aLIGO TCS Ring Heater Assembly, Lower Segment |
Giacomo Ciani et al. |
Fabrication
Auxiliary Optics
Vacuum
|
19 Jun 2013 |
T1400593-v2 |
Optical Lever Fermion II Internal Optimization Procedure |
Suresh Doravari |
Auxiliary Optics
Subsystem Test
|
10 May 2017 |
M1300574-v1 |
LLO PCAL SOP (Temporary) |
Christopher Guido et al. |
Policies
Installation
|
01 Oct 2015 |
L1400006-x0 |
Fabrication Acceptance Review Documents and Status |
David Shoemaker et al. |
Detector
Reviews
|
06 May 2015 |
E1500123-v2 |
Fabrication Acceptance Review Status of Input Optics EOM Testing, Modeling and Discussion of need for Waivers from Systems |
Christopher Guido et al. |
Reviews
Input Optics
|
11 Mar 2015 |
P1400105-v5 |
Achieving Resonance in the Advanced LIGO Gravitational-Wave Interferometer |
Alexa N Staley et al. |
Basic R&D
Integration
Sensing and Control
|
05 Mar 2015 |
G1400710-v1 |
L1 TransMonEY Telescope Focal Tuning Results |
Adam Mullavey et al. |
Commissioning
Auxiliary Optics
|
21 Jan 2015 |
T1400429-v1 |
As Built TransMon EY Telescope and Table (L1) |
Adam Mullavey et al. |
Sensing and Control
Installation
|
21 Jan 2015 |
G1400530-v1 |
L1 TransMon GREEN QPD sleds tuning (both EX and EY) |
Adam Mullavey et al. |
Sensing and Control
Installation
|
21 Jan 2015 |
E1100491-v6 |
SLC Mode Cleaner Tube Baffle Install Hazard Analysis |
Michael Smith et al. |
Safety
Auxiliary Optics
|
20 Feb 2014 |
D1001517-v6 |
TCS Ring Heater In-Vac Cable Assembly |
Christopher Guido et al. |
Auxiliary Optics
Fabrication
Final Design
Vacuum
|
12 Feb 2014 |
T1300342-v2 |
OFI Optical Test Results, LLO |
Christopher Guido et al. |
Auxiliary Optics
Subsystem Test
|
23 Apr 2013 |
D1200265-v3 |
Elevation Support Web, CO2 Laser Projection Steering Mirror 2, H1-L1 |
Mindy Jacobson et al. |
Preliminary Design
Vacuum
Assembly
Fabrication
Auxiliary Optics
Final Design
|
22 Feb 2013 |
D1102384-v3 |
aLIGO TCS CO2P SM2 ASSY LONG SUPPORT |
Mindy Jacobson et al. |
Vacuum
Preliminary Design
Final Design
Auxiliary Optics
Fabrication
|
22 Feb 2013 |
D1201407-v1 |
Short Damping Spacer, aLIGO TCS CO2P Steering Mirror Assembly 1 H1-L1 |
Greg Grabeel et al. |
Vacuum
Assembly
Auxiliary Optics
|
31 Jan 2013 |
D1101294-v3 |
H1-L1 SM1 Azimuth Bracket |
Mindy Jacobson et al. |
Vacuum
Preliminary Design
Final Design
Auxiliary Optics
Fabrication
|
19 Dec 2012 |
E1200830-x0 |
DCN, Custom Part Modifications Allowing Slip-Fit, aLIGO TCS SM1 Assembly |
Mindy Jacobson et al. |
Fabrication
Auxiliary Optics
Vacuum
Assembly
|
08 Nov 2012 |
D1201406-v1 |
Long Damping Spacer, aLIGO TCS CO2P Steering Mirror 1 Assembly H1-L1 |
Greg Grabeel et al. |
Auxiliary Optics
Vacuum
Assembly
|
08 Nov 2012 |
E1200723-v1 |
DCN, Part Changes of Assembly D1101851 Per Conclusions of Initial BSC2 Fit Check |
Christopher Guido et al. |
Installation
Assembly
Vacuum
Auxiliary Optics
|
02 Nov 2012 |
D1201442-v1 |
Air Bake Fixture, aLIGO TCS CO2P UHV Steering Mirror 1 |
Mindy Jacobson et al. |
Vacuum
Assembly
Auxiliary Optics
Cleaning
|
31 Oct 2012 |
D1102380-v2 |
aLIGO TCS CO2P SM2 ASSY SHORT SUPPORT |
Mindy Jacobson et al. |
Vacuum
Preliminary Design
Final Design
Auxiliary Optics
Fabrication
|
06 Aug 2012 |
S0900294-v4 |
TCS Interface Commbox |
Christopher Guido |
Auxiliary Optics
|
09 Mar 2012 |
T1000705-v2 |
Hartmann Wavefront Sensor (HWS) delta-preliminary design review (PDR) documentation |
Jesper Munch et al. |
Preliminary Design
Auxiliary Optics
|
15 Feb 2012 |
S0900299-v1 |
TCS Chassis Connector Board |
Christopher Guido |
Auxiliary Optics
|
31 Oct 2009 |
D040339-v1 |
TCS Interface Commbox |
Christopher Guido |
Auxiliary Optics
|
19 Oct 2009 |
S0900293-v1 |
TCS ISS Servo and Interface Board |
Christopher Guido |
Auxiliary Optics
|
15 Oct 2009 |
S0900238-v1 |
TCS AA Interface Board |
Christopher Guido |
Auxiliary Optics
|
13 Oct 2009 |