LIGO-Number |
Title |
Author(s) |
Topic(s) |
Last Updated |
E1200490-x0 |
aLIGO, PSL, Frequency Stabilization (FSS) |
Benno Willke et al. |
Laser Systems
|
03 Oct 2024 |
M0900136-v2 |
Restricted Work Alone Policy |
Charles Taylor et al. |
Policies
Safety
|
23 Jun 2018 |
E1200480-v1 |
aLIGO, PSL |
Peter King et al. |
Laser Systems
|
23 Jun 2023 |
T0900614-v1 |
aLIGO PSL Safety Plan |
Peter King |
Safety
Laser Systems
|
21 Sep 2016 |
D2100733-v1 |
Pcal transfer standard transimpedance amplifier circuit board |
Richard Savage et al. |
Calibration
Auxiliary Optics
|
03 Aug 2022 |
D1300210-v7 |
PCal Photodiode Board |
Richard Savage et al. |
Auxiliary Optics
|
18 Nov 2021 |
T1700543-v2 |
aLIGO all-bolted PMC summary |
Liu Jian et al. |
Input Optics
|
12 Oct 2021 |
D1200032-v1 |
Isomet 1205C-843 Modification |
Peter King |
Fabrication
|
07 Aug 2019 |
E1200489-x0 |
aLIGO, PSL, Intensity Stabilization (ISS) |
Benno Willke et al. |
Laser Systems
|
09 Jan 2019 |
E1200491-x0 |
aLIGO, PSL, Pre-Modecleaner (PMC) |
Benno Willke et al. |
Laser Systems
|
11 Oct 2018 |
E1300889-v1 |
aLIGO PSL VCO Amplifier Assembly Instructions |
Peter King |
Fabrication
|
21 Sep 2016 |
D1301002-v1 |
Power D-sub to Circuit Breaker Wire |
Peter King |
Fabrication
|
21 Sep 2016 |
T1300953-v1 |
aLIGO PSL VCO Amplifier HTS Codes |
Peter King |
Fabrication
|
21 Sep 2016 |
D1201514-v1 |
aLIGO PSL VCO Amplifier Assembly Drawing |
Peter King |
Fabrication
|
21 Sep 2016 |
D1201428-v1 |
aLIGO PSL VCO Amplifier SMA Cable |
Peter King |
Fabrication
|
21 Sep 2016 |
D1201427-v1 |
aLIGO PSL VCO Amplifier Type N Cable |
Peter King |
Fabrication
|
21 Sep 2016 |
D1201426-v1 |
aLIGO PSL VCO Amplifier Chassis Drawing |
Peter King |
Fabrication
|
21 Sep 2016 |
D1201424-v1 |
aLIGO PSL VCO Amplifier Front Panel |
Peter King |
Fabrication
|
21 Sep 2016 |
D1201425-v1 |
aLIGO PSL VCO Amplifier Rear Panel |
Peter King |
Fabrication
|
21 Sep 2016 |
D1301011-v1 |
D1300439 Front Panel |
Peter King |
Fabrication
|
21 Sep 2016 |
T1300867-v1 |
Control loop design for the aLIGO second loop power stabilization |
Jan Poeld et al. |
Laser Systems
|
21 Sep 2016 |
T0900568-v3 |
Advanced LIGO PSL Installation Plan |
Richard Savage et al. |
Installation
Final Design
Observatory Facilities
Laser Systems
|
21 Sep 2016 |
T0900649-v4 |
PSL Final Design Document |
Patrick Kwee et al. |
Final Design
Laser Systems
|
21 Sep 2016 |
T070195-v1 |
Preliminary Design – AdvLIGO PSL Laser Diode Room |
Rusyl Wooley et al. |
Laser Systems
Preliminary Design
|
21 Sep 2016 |
T1100529-v1 |
PSL Laser Area Enclosure Air Shower Egress |
Peter King |
Installation
Safety
Laser Systems
|
21 Sep 2016 |
T1000028-v1 |
aLIGO Laser Area Enclosure Concept |
Richard Savage et al. |
Final Design
Laser Systems
|
21 Sep 2016 |
E021114-x0 |
RFI Mitigation Review Board Report |
Rich Abbott et al. |
Document Migration
|
12 Feb 2016 |
E1200487-x0 |
aLIGO, PSL, System Overview |
Benno Willke et al. |
Laser Systems
|
13 Dec 2015 |
T1500091-v1 |
3IFO PSL ISS Photodetector Array Inventory Peter King Email |
Gary Davis et al. |
Project Controls
|
20 Mar 2015 |
E1400466-v4 |
aLIGO Installation Acceptance Document for H1 PSL |
Michael Landry et al. |
Installation
|
11 Feb 2015 |
E1200493-x0 |
aLIGO, PSL, Real-Time System |
Benno Willke et al. |
Laser Systems
|
29 Oct 2014 |
E1200492-x0 |
aLIGO, PSL, Diagnostic Breadboard (DBB) |
Benno Willke et al. |
Laser Systems
|
29 Oct 2014 |
E1200488-x0 |
aLIGO, PSL,Laser |
Benno Willke et al. |
Laser Systems
|
29 Oct 2014 |
T050036-v4 |
Pre-Stabilized Laser Design Requirements |
Richard Savage et al. |
Laser Systems
Requirements
|
20 Aug 2014 |
T080247-v1 |
PSL FMEA |
Peter King |
Safety
|
19 Jun 2014 |
T1300860-v1 |
ISS PD Array Alignment Procedure |
Rich Abbott et al. |
Laser Systems
Subsystem Test
|
07 Jan 2014 |
T080153-x0 |
A Proposed Laser Incident Threshold Level |
Peter King |
Document Migration
Safety
|
04 Dec 2009 |
E1200494-x0 |
aLIGO, PSL, Test Reports |
Benno Willke et al. |
Laser Systems
|
16 May 2012 |
E080451-x0 |
Document Change Notice (DCN) - A Proposed Laser Incident Threshold Level |
Peter King |
Document Migration
|
27 Aug 2008 |
T070133-x0 |
A Quick Test Of Laser Safety Eyewear |
Peter King |
Document Migration
|
21 Apr 2008 |
G080071-x0 |
The Advanced LIGO PSL Overview and Controls |
Peter King |
Document Migration
|
14 Mar 2008 |
G070847-x0 |
Hazard Analysis |
Peter King |
Document Migration
|
01 Feb 2008 |
T070248-x0 |
Advanced LIGO Input Optics Preliminary Design Review Report |
Dennis Coyne et al. |
Document Migration
|
06 Nov 2007 |
G070745-x0 |
Advanced LIGO PSL Power Stabilization - LSC/Virgo Collaborations Meeting, October 22-25 2007, Hannover Germany |
Peter King |
Document Migration
|
30 Oct 2007 |
G070615-x0 |
Advanced LIGO PSL Infrastructure and Safety Review, Response to Committee Comments |
Peter King et al. |
Document Migration
|
14 Sep 2007 |
T050035-x0 |
Advanced LIGO Pre-stabilized Laser Conceptual Design Document |
Maik Frede et al. |
Document Migration
|
21 Jun 2007 |
G070130-x0 |
eLigo PSL laser diode room strawman design - LIGO/VIRGO Scientific Collaborations Meeting, Hilton Capitol Center, Baton Rouge LA, March 19-22, 2007 |
Anamaria Effler et al. |
Document Migration
|
27 Mar 2007 |
G070136-x0 |
AdLIGO PSL Safety Plan - LIGO/VIRGO Scientific Collaborations Meeting, Hilton Capitol Center, Baton Rouge LA, March 19-22, 2007 |
Peter King |
Document Migration
|
22 Mar 2007 |
E070020-x0 |
Process Traveler - 10-W Laser Head Interface |
Peter King |
Document Migration
|
26 Feb 2007 |
E070018-x0 |
Process Traveler - 10-W Laser Head Interface |
Peter King |
Document Migration
|
26 Feb 2007 |
E070024-x0 |
Process Traveler - 10-W Laser Head Interface |
Peter King |
Document Migration
|
26 Feb 2007 |
E070022-x0 |
Process Traveler - 10-W Laser Head Interface |
Peter King |
Document Migration
|
26 Feb 2007 |
E070021-x0 |
Process Traveler - 10-W Laser Head Interface |
Peter King |
Document Migration
|
26 Feb 2007 |
E070015-x0 |
Process Traveler - 10-W Laser Head Interface |
Peter King |
Document Migration
|
26 Feb 2007 |
E070016-x0 |
Process Traveler - 10-W Laser Head Interface |
Peter King |
Document Migration
|
26 Feb 2007 |
E070023-x0 |
Process Traveler - 10-W Laser Head Interface |
Peter King |
Document Migration
|
26 Feb 2007 |
E070017-x0 |
Process Traveler - 10-W Laser Head Interface |
Peter King |
Document Migration
|
26 Feb 2007 |
E070019-x0 |
Process Traveler - 10-W Laser Head Interface |
Peter King |
Document Migration
|
26 Feb 2007 |
T070010-x0 |
10-W Laser Head Interface Test Procedure |
Peter King |
Document Migration
|
24 Jan 2007 |
D040195-x0 |
OMC Prototype Vacuum Chamber |
Peter King |
Document Migration
|
14 May 2004 |
D040151-x0 |
PRISM - Output Modecleaner Prototype |
Peter King |
Document Migration
|
30 Apr 2004 |
G040139-x0 |
LIGO PSL Status - LSC Meeting, March 15 - 18th, Livingston, LA |
Peter King |
Document Migration
|
25 Mar 2004 |
G030329-x0 |
Accoustic Mitigation Team Progress Report |
Douglas Cook et al. |
Document Migration
|
09 Jul 2003 |
G030107-x0 |
Advanced LIGO Pre-stabilized Laser (PSL) Design Requirements - LSC Meeting, March 17th - 20th, Livingston, LA |
Peter King |
Document Migration
|
19 Mar 2003 |
D980675-x0 |
Pre-Modecleaner Body Block |
Peter King |
Document Migration
|
22 Jan 2003 |
D020657-x0 |
GEO/LIGO PSL Cross Connect Panel Drawings |
Peter King |
Document Migration
|
19 Nov 2002 |
G020453-x0 |
Advanced LIGO R&D Review: The PSL |
Rich Abbott et al. |
Document Migration
|
09 Oct 2002 |
G020454-x0 |
Advanced LIGO R&D Review: Input Optics |
Peter King |
Document Migration
|
09 Oct 2002 |
T010145-x0 |
LIGO Caltech 40-Meter PSL Commissioning Report |
Benjamin Abbott et al. |
Document Migration
|
05 Dec 2001 |
G010382-x0 |
A Very Highly Frequency and Amplitude Stabilized Laser for Precision Interferometry |
Rich Abbott et al. |
Document Migration
|
15 Oct 2001 |
E010150-x0 |
Document Change Notice (DCN) |
Peter King |
Document Migration
|
24 Aug 2001 |
D010118-x0 |
NPRO LASER 3" OPTICAL HEIGHT SPACER |
Peter King |
Document Migration
|
13 Jul 2001 |
D000235-x0 |
Short Isolation Stack, Bottom Plate |
Peter King |
Document Migration
|
04 May 2001 |
D010084-x0 |
Frequency Shifter Adapter Plates |
Peter King |
Document Migration
|
25 Apr 2001 |
D010056-x0 |
1.00 in. dia. Super Polished Fused Silica Substrate |
Peter King |
Document Migration
|
19 Mar 2001 |
G000326-x0 |
The LIGO I Pre-Stabilized Laser (LIGO II Meeting with LZH) |
Peter King |
Document Migration
|
10 Nov 2000 |
T000082-x0 |
Diode-Pumped Nd:YAG Laser Intensity Noise Suppression Using a Current Shunt |
Ken Abbott et al. |
Document Migration
|
22 Aug 2000 |
D000234-x0 |
Reference Cavity Short Vacuum Chamber |
Peter King |
Document Migration
|
08 Aug 2000 |
T000031-x0 |
LIGO Hanford Observatory 2k IFO PSL Test Report |
Rich Abbott et al. |
Document Migration
|
10 Mar 2000 |
D980716-x0 |
Reference Cavity, Vacuum Chamber |
Peter King |
Document Migration
|
17 Nov 1999 |
T990047-x0 |
The LHO 2k IFO PSL BURT Setup |
Peter King |
Document Migration
|
14 Jul 1999 |
D990211-x0 |
LLO 4k IFO PSL Water Chiller Location |
Peter King |
Document Migration
|
12 May 1999 |
G980049-x0 |
LIGO Science Collaboration (LSC) Meeting Presentations, 12-14 March 1998, Hanford: Detection Confidence & Statistical Analysis |
Lee Samuel Finn et al. |
Document Migration
|
01 Apr 1999 |
G990021-x0 |
PSL Final Design Review Viewgraphs |
Rich Abbott et al. |
Document Migration
|
19 Mar 1999 |
D980679-x0 |
Reference Cavity, Vacuum Chamber Heater |
Peter King |
Document Migration
|
10 Mar 1999 |
D980676-x0 |
Reference Cavity, Vacuum Chamber |
Peter King |
Document Migration
|
10 Mar 1999 |
D980670-x0 |
Reference Cavity Spacer |
Peter King |
Document Migration
|
10 Mar 1999 |
D980672-x0 |
9071 Tilt Stage, 1205C-843 AOM Base |
Peter King |
Document Migration
|
10 Mar 1999 |
D980671-x0 |
Gimbal Mirror Mount, Mounting Block |
Peter King |
Document Migration
|
10 Mar 1999 |
D980673-x0 |
426 Translation Stage, 9071 Tilt Stage Spacer |
Peter King |
Document Migration
|
10 Mar 1999 |
T990025-x0 |
(Infrared) Pre-stabilized Laser (PSL) Final Design Document |
Rich Abbott et al. |
Document Migration
|
10 Mar 1999 |
D980674-x0 |
1201E-2 Intensity Stabilization AOM Mounting Block |
Peter King |
Document Migration
|
10 Mar 1999 |
D980677-x0 |
Photodetector Housing Lid Hole Placement |
Peter King |
Document Migration
|
10 Mar 1999 |
D980350-x0 |
Vibration Isolation Stack PTFE Base Plate |
Peter King |
Document Migration
|
28 Dec 1998 |
T970080-x0 |
(Infrared) Pre-Stabilized Laser (PSL) Design Requirements |
Peter King et al. |
Document Migration
|
16 Jul 1997 |
T970087-x0 |
(Infrared) Pre-Stabilized Laser (PSL) Conceptual Design |
Rich Abbott et al. |
Document Migration
|
16 Jul 1997 |