LIGO Document E1000058-v46
- Spreadsheet providing the status of each individual GS-13 at LLO site during aLIGO HAM assembly.
Data for the GS13 testing after modification are in the SVN at:
SeismicSVN\seismic\Common\Data\aLIGO_GS13_TestData\PostMod_TestResults_PDFs.
- New version as of 01/16/14.
DCC Version 3.5.0, contact
DCC Help