Document List by Author

Celine Ramet of LIGO - Livingston Observatory is listed as an author on the following documents:

LIGO-Number Title Author(s) Topic(s) Last Updated
T1000388-v18 aLIGO SEI Actuators and Sensors Change of Basis (ISI, Transformation, Orientation, Matrix, Coordinates) Fabrice Matichard et al. Seismic Isolation
30 Aug 2024
D0901182-v1 aLIGO, SEI, BSC-ISI, Top Assembly Stephany Foley et al. Final Design
Seismic Isolation
30 Aug 2024
T1300559-v1 Changing the ISI CPS offsets to the Cartesian (CART) Basis Brian Lantz et al. Integration
Seismic Isolation
09 May 2022
E1200104-v6 aLIGO HAM-ISI, Pre-Installation Test Report, Phase II, LLO HAM 3 Celine Ramet et al. Seismic Isolation
23 Jul 2021
E1200068-v18 aLIGO SEI STS and T240 Ground Seismometer Inventory Celine Ramet et al. Seismic Isolation
Installation
01 Aug 2016
P1200011-v6 Dynamics Enhancements of Advanced LIGO Multi-Stage Active Vibration Isolators and Related Control Performance Improvement Fabrice Matichard et al. Seismic Isolation
Basic R&D
20 Jun 2018
G0900457-v1 Adv LIGO BSC-ISI Stage 0 Design Review Celine Ramet Seismic Isolation
Conceptual Design
20 Jun 2018
G0900725-v2 Adv LIGO BSC Flexure Rod Attachment Redesign Celine Ramet Conceptual Design
Seismic Isolation
20 Jun 2018
G0900676-v3 Advanced LIGO Preliminary Design Review of the BSC ISI system - Overview Presentation Stephany Foley et al. Seismic Isolation
Preliminary Design
Reviews
20 Jun 2018
G1100507-v2 aLIGO SEI Testing Presentation, HAM-ISI, LLO Unit 3 Vincent Lhuillier et al. Subsystem Test
Seismic Isolation
20 Jun 2018
G1200910-v4 aLIGO Seismic Isolation Status Update Celine Ramet et al. Public Talk / Colloquium
Seismic Isolation
20 Jun 2018
G1400089-v1 aLIGO SEI overview for Detector Group Meeting Celine Ramet Seismic Isolation
20 Jun 2018
E1300927-v1 aLIGO HEPI L1 HAM6 Assembly Validation Report Celine Ramet Subsystem Test
Seismic Isolation
17 Apr 2015
E1000029-v162 LLO SEI Clean and Bake Priority Celine Ramet Seismic Isolation
Installation
17 Apr 2015
E1100276-v15 aLIGO HEPI Testing Documentation Sebastien Biscans et al. Seismic Isolation
Subsystem Test
25 Mar 2015
E1300930-v2 aLIGO HEPI L1 ITMY (BSC1) Assembly Validation Report Celine Ramet Seismic Isolation
Subsystem Test
06 Mar 2015
E1300928-v2 aLIGO HEPI L1 ITMX (BSC3) Assembly Validation Report Celine Ramet Subsystem Test
Seismic Isolation
06 Mar 2015
E1300926-v3 aLIGO HEPI L1 HAM5 Assembly Validation Report Celine Ramet et al. Subsystem Test
Seismic Isolation
06 Mar 2015
E1300925-v2 aLIGO HEPI L1 HAM4 Assembly Validation Report Celine Ramet et al. Subsystem Test
Seismic Isolation
06 Mar 2015
E1300924-v2 aLIGO HEPI L1 HAM3 Assembly Validation Report Celine Ramet et al. Subsystem Test
Seismic Isolation
06 Mar 2015
E1300923-v2 aLIGO HEPI L1 HAM2 Assembly Validation Report Celine Ramet Seismic Isolation
Subsystem Test
06 Mar 2015
E1200103-v3 aLIGO HAM-ISI, Pre-Installation Test Report, Phase II, LLO HAM 4 (Unit #4) James Thomas et al. Subsystem Test
Seismic Isolation
17 Feb 2015
D0902370-v1 Adv LIGO SEI HEPI Circuit box mounting plate Celine Ramet Seismic Isolation
Final Design
04 Feb 2015
E1100427-v4 aLIGO SEI Testing, HAM-ISI, Results Compilation Hugo Paris et al. Subsystem Test
Seismic Isolation
05 Nov 2014
E1000331-v3 aLIGO HAM-ISI, Pre-integration Test Report, Phase I, LLO Unit #7 Fabrice Matichard et al. Subsystem Test
Seismic Isolation
26 Oct 2014
E1000329-v1 aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LLO Unit #5 (HAM5) Celine Ramet Subsystem Test
Seismic Isolation
23 Oct 2014
E1300847-v8 aLIGO Installation Acceptance Document for LBSC2 Stuart Aston et al. Installation
20 Sep 2014
E1400082-v4 aLIGO Installation Acceptance Document for LBSC5 (Y) Stuart Aston et al. Installation
21 Jun 2014
E1300932-x0 aLIGO HEPI L1 ETMY (BSC5) Assembly Validation Report Celine Ramet Subsystem Test
Seismic Isolation
18 Jun 2014
E1300931-v1 aLIGO HEPI L1 ETMX (BSC4) Assembly Validation Report Celine Ramet Seismic Isolation
Subsystem Test
18 Jun 2014
E1300929-v1 aLIGO HEPI L1 BS (BSC2) Assembly Validation Report Celine Ramet Seismic Isolation
Subsystem Test
18 Jun 2014
E1300922-x0 aLIGO HEPI L1 HAM1 Assembly Validation Report Celine Ramet Seismic Isolation
Subsystem Test
18 Jun 2014
E1100859-v3 aLIGO BSC-ISI, Test Report, Phase 2, LLO Unit #5 (L1-BSC5 ETMY) Vincent Lhuillier et al. Seismic Isolation
Subsystem Test
18 Jun 2014
E1100858-v4 aLIGO BSC-ISI, Test Report, Phase 2, LLO Unit #4 (L1-BSC4 ETMX) Vincent Lhuillier et al. Seismic Isolation
Subsystem Test
18 Jun 2014
E1100856-v2 aLIGO BSC-ISI, Test Report, Phase 2, LLO Unit #2 (L1-BSC1 - ITMY) Vincent Lhuillier et al. Subsystem Test
Seismic Isolation
18 Jun 2014
E1100855-v3 aLIGO BSC-ISI, Test Report, Phase 2, L1 BSC 2 (LLO Unit #1) Vincent Lhuillier et al. Seismic Isolation
Subsystem Test
18 Jun 2014
E1100304-v3 aLIGO BSC-ISI, LLO Unit #1: Phase I Testing Report (Assembly Validation) Adrien Le Roux et al. Subsystem Test
Seismic Isolation
18 Jun 2014
E1300155-v6 aLIGO HAM-ISI, Phase III Testing report (Control Commissioning), LLO HAM 3 Ryan DeRosa et al. Subsystem Test
Seismic Isolation
18 Jun 2014
E1200105-v4 aLIGO HAM-ISI, Pre-integration Test Report, Phase II, LLO HAM 2 Fabrice Matichard et al. Seismic Isolation
18 Jun 2014
E1101141-v1 Neon Leak Testing Results for Seismometer Pods installed on H2 BSC 6 Michael Vargas et al. Subsystem Test
Seismic Isolation
18 Jun 2014
E1101140-v1 Neon Leak Testing Results for Seismometer Pods installed on H2 BSC 8 Michael Vargas et al. Subsystem Test
Seismic Isolation
18 Jun 2014
E1101139-x0 Neon Leak Testing Results for Seismometer Pods installed on ISIs Celine Ramet Seismic Isolation
Installation
Subsystem Test
18 Jun 2014
E1000136-v15 aLIGO L4C Status Chart Celine Ramet Seismic Isolation
Subsystem Test
18 Jun 2014
Q1100073-v32 Seismometer and Pod Issue Tracking Michael Vargas et al. Requirements
Subsystem Test
Seismic Isolation
Assembly
18 Jun 2014
F0900070-v6 GS-13 Inspection Checklist Joe Hanson et al. Incoming Inspection
Seismic Isolation
Installation
Subsystem Test
18 Jun 2014
E1100395-v1 aLIGO GS-13 Post Modification testing results Jeffrey Kissel et al. Subsystem Test
Seismic Isolation
18 Jun 2014
E1100393-v2 aLIGO GS-13 as received testing results Jeffrey Kissel et al. Seismic Isolation
Subsystem Test
18 Jun 2014
E1000058-v46 aLIGO GS-13 Status Chart Jeffrey Kissel et al. Installation
Seismic Isolation
18 Jun 2014
E1100326-v14 aLIGO T 240 seismometers for BSC-ISI Celine Ramet Seismic Isolation
18 Jun 2014
E0900357-v28 aLIGO BSC-ISI, General Assembly Procedure Michael Hillard et al. Assembly
Seismic Isolation
18 Jun 2014
E1100995-v10 aLIGO HAM-ISI Testing Procedure, Phase III: Control Commissioning Sebastien Biscans et al. Subsystem Test
Seismic Isolation
23 Apr 2013
E1000325-v1 aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LLO Unit #1 (LIGO-MIT) Celine Ramet Subsystem Test
Seismic Isolation
05 Apr 2012
E1000327-v7 aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LLO Unit #3 (HAM3) Celine Ramet Final Design
Seismic Isolation
05 Apr 2012
E1000326-v5 aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LLO Unit #2 (HAM2) Celine Ramet Seismic Isolation
Subsystem Test
05 Apr 2012
E1000328-v2 aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LLO Unit #4 (HAM4) Celine Ramet Seismic Isolation
Final Design
05 Apr 2012
L0900118-v8 Advanced LIGO Preliminary Design Review of the BSC ISI system Fabrice Matichard et al. Reviews
Preliminary Design
Seismic Isolation
04 May 2011
D1003361-v1 aLIGO HEPI-HAM Sliding Clamp Celine Ramet Seismic Isolation
12 Jan 2011
D0901499-v1 Blade spring Post, Stage 0-1, aLIGO BSC-ISI Andy Stein et al. Seismic Isolation
Final Design
02 Dec 2010
D0902594-v3 Threaded Pivot, Stage 0-1 Blade Pusher, aLIGO BSC-ISI Celine Ramet Seismic Isolation
Final Design
21 Sep 2010
D0901500-v1 Flexure Rod Shim, Stage 0-1, aLIGO BSC ISI Celine Ramet et al. Final Design
Seismic Isolation
10 Sep 2010
D0902200-v1 Top Saddle on Bracket, Stage 0-1 Blade Pusher, aLIGO BSC-ISI Sam Barnum et al. Final Design
Seismic Isolation
27 Jul 2010
D0900895-v2 BSC-ISI Stage 0 Monolithic Half Top Celine Ramet Final Design
Seismic Isolation
23 Jul 2010
D0900894-v2 BSC-ISI Stage 0 Monolithic Half Bottom Celine Ramet Seismic Isolation
Final Design
23 Jul 2010
D0901755-v1 Flexure Cup Stage 0-1, aLIGO BSC ISI Celine Ramet et al. Seismic Isolation
Final Design
03 Mar 2010
D0901502-v1 Bracket Flexure Rod Shim, Stage 0-1, aLIGO BSC ISI Celine Ramet Final Design
Seismic Isolation
01 Mar 2010
D0902420-v1 Flexure Rod Shaft Collar Tapped Side, Stage 0-1, aLIGO BSC ISI Celine Ramet et al. Seismic Isolation
Final Design
01 Mar 2010
D0901757-v1 Flexure Rod, Stage 0-1, aLIGO BSC-ISI Celine Ramet et al. Seismic Isolation
Final Design
01 Mar 2010
D0902103-v1 Flexure Assembly, Stage 0-1, aLIGO BSC ISI Celine Ramet et al. Final Design
Seismic Isolation
01 Mar 2010
D0902593-v1 Pusher Pivot Assembly, Stage 0-1 Blade Pusher, aLIGO BSC-ISI Celine Ramet Seismic Isolation
Final Design
21 Feb 2010
G0900323-v2 Kick-off Meeting Stage 0 Redesign- Presentation Celine Ramet Conceptual Design
07 May 2009

Number of documents found: 70