LIGO-Number |
Title |
Author(s) |
Topic(s) |
Last Updated |
T1000388-v18 |
aLIGO SEI Actuators and Sensors Change of Basis (ISI, Transformation, Orientation, Matrix, Coordinates) |
Fabrice Matichard et al. |
Seismic Isolation
|
30 Aug 2024 |
D0901182-v1 |
aLIGO, SEI, BSC-ISI, Top Assembly |
Stephany Foley et al. |
Final Design
Seismic Isolation
|
30 Aug 2024 |
T1300559-v1 |
Changing the ISI CPS offsets to the Cartesian (CART) Basis |
Brian Lantz et al. |
Integration
Seismic Isolation
|
09 May 2022 |
E1200104-v6 |
aLIGO HAM-ISI, Pre-Installation Test Report, Phase II, LLO HAM 3 |
Celine Ramet et al. |
Seismic Isolation
|
23 Jul 2021 |
E1200068-v18 |
aLIGO SEI STS and T240 Ground Seismometer Inventory |
Celine Ramet et al. |
Seismic Isolation
Installation
|
01 Aug 2016 |
P1200011-v6 |
Dynamics Enhancements of Advanced LIGO Multi-Stage Active Vibration Isolators and Related Control Performance Improvement |
Fabrice Matichard et al. |
Seismic Isolation
Basic R&D
|
20 Jun 2018 |
G0900457-v1 |
Adv LIGO BSC-ISI Stage 0 Design Review |
Celine Ramet |
Seismic Isolation
Conceptual Design
|
20 Jun 2018 |
G0900725-v2 |
Adv LIGO BSC Flexure Rod Attachment Redesign |
Celine Ramet |
Conceptual Design
Seismic Isolation
|
20 Jun 2018 |
G0900676-v3 |
Advanced LIGO Preliminary Design Review of the BSC ISI system - Overview Presentation |
Stephany Foley et al. |
Seismic Isolation
Preliminary Design
Reviews
|
20 Jun 2018 |
G1100507-v2 |
aLIGO SEI Testing Presentation, HAM-ISI, LLO Unit 3 |
Vincent Lhuillier et al. |
Subsystem Test
Seismic Isolation
|
20 Jun 2018 |
G1200910-v4 |
aLIGO Seismic Isolation Status Update |
Celine Ramet et al. |
Public Talk / Colloquium
Seismic Isolation
|
20 Jun 2018 |
G1400089-v1 |
aLIGO SEI overview for Detector Group Meeting |
Celine Ramet |
Seismic Isolation
|
20 Jun 2018 |
E1300927-v1 |
aLIGO HEPI L1 HAM6 Assembly Validation Report |
Celine Ramet |
Subsystem Test
Seismic Isolation
|
17 Apr 2015 |
E1000029-v162 |
LLO SEI Clean and Bake Priority |
Celine Ramet |
Seismic Isolation
Installation
|
17 Apr 2015 |
E1100276-v15 |
aLIGO HEPI Testing Documentation |
Sebastien Biscans et al. |
Seismic Isolation
Subsystem Test
|
25 Mar 2015 |
E1300930-v2 |
aLIGO HEPI L1 ITMY (BSC1) Assembly Validation Report |
Celine Ramet |
Seismic Isolation
Subsystem Test
|
06 Mar 2015 |
E1300928-v2 |
aLIGO HEPI L1 ITMX (BSC3) Assembly Validation Report |
Celine Ramet |
Subsystem Test
Seismic Isolation
|
06 Mar 2015 |
E1300926-v3 |
aLIGO HEPI L1 HAM5 Assembly Validation Report |
Celine Ramet et al. |
Subsystem Test
Seismic Isolation
|
06 Mar 2015 |
E1300925-v2 |
aLIGO HEPI L1 HAM4 Assembly Validation Report |
Celine Ramet et al. |
Subsystem Test
Seismic Isolation
|
06 Mar 2015 |
E1300924-v2 |
aLIGO HEPI L1 HAM3 Assembly Validation Report |
Celine Ramet et al. |
Subsystem Test
Seismic Isolation
|
06 Mar 2015 |
E1300923-v2 |
aLIGO HEPI L1 HAM2 Assembly Validation Report |
Celine Ramet |
Seismic Isolation
Subsystem Test
|
06 Mar 2015 |
E1200103-v3 |
aLIGO HAM-ISI, Pre-Installation Test Report, Phase II, LLO HAM 4 (Unit #4) |
James Thomas et al. |
Subsystem Test
Seismic Isolation
|
17 Feb 2015 |
D0902370-v1 |
Adv LIGO SEI HEPI Circuit box mounting plate |
Celine Ramet |
Seismic Isolation
Final Design
|
04 Feb 2015 |
E1100427-v4 |
aLIGO SEI Testing, HAM-ISI, Results Compilation |
Hugo Paris et al. |
Subsystem Test
Seismic Isolation
|
05 Nov 2014 |
E1000331-v3 |
aLIGO HAM-ISI, Pre-integration Test Report, Phase I, LLO Unit #7 |
Fabrice Matichard et al. |
Subsystem Test
Seismic Isolation
|
26 Oct 2014 |
E1000329-v1 |
aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LLO Unit #5 (HAM5) |
Celine Ramet |
Subsystem Test
Seismic Isolation
|
23 Oct 2014 |
E1300847-v8 |
aLIGO Installation Acceptance Document for LBSC2 |
Stuart Aston et al. |
Installation
|
20 Sep 2014 |
E1400082-v4 |
aLIGO Installation Acceptance Document for LBSC5 (Y) |
Stuart Aston et al. |
Installation
|
21 Jun 2014 |
E1300932-x0 |
aLIGO HEPI L1 ETMY (BSC5) Assembly Validation Report |
Celine Ramet |
Subsystem Test
Seismic Isolation
|
18 Jun 2014 |
E1300931-v1 |
aLIGO HEPI L1 ETMX (BSC4) Assembly Validation Report |
Celine Ramet |
Seismic Isolation
Subsystem Test
|
18 Jun 2014 |
E1300929-v1 |
aLIGO HEPI L1 BS (BSC2) Assembly Validation Report |
Celine Ramet |
Seismic Isolation
Subsystem Test
|
18 Jun 2014 |
E1300922-x0 |
aLIGO HEPI L1 HAM1 Assembly Validation Report |
Celine Ramet |
Seismic Isolation
Subsystem Test
|
18 Jun 2014 |
E1100859-v3 |
aLIGO BSC-ISI, Test Report, Phase 2, LLO Unit #5 (L1-BSC5 ETMY) |
Vincent Lhuillier et al. |
Seismic Isolation
Subsystem Test
|
18 Jun 2014 |
E1100858-v4 |
aLIGO BSC-ISI, Test Report, Phase 2, LLO Unit #4 (L1-BSC4 ETMX) |
Vincent Lhuillier et al. |
Seismic Isolation
Subsystem Test
|
18 Jun 2014 |
E1100856-v2 |
aLIGO BSC-ISI, Test Report, Phase 2, LLO Unit #2 (L1-BSC1 - ITMY) |
Vincent Lhuillier et al. |
Subsystem Test
Seismic Isolation
|
18 Jun 2014 |
E1100855-v3 |
aLIGO BSC-ISI, Test Report, Phase 2, L1 BSC 2 (LLO Unit #1) |
Vincent Lhuillier et al. |
Seismic Isolation
Subsystem Test
|
18 Jun 2014 |
E1100304-v3 |
aLIGO BSC-ISI, LLO Unit #1: Phase I Testing Report (Assembly Validation) |
Adrien Le Roux et al. |
Subsystem Test
Seismic Isolation
|
18 Jun 2014 |
E1300155-v6 |
aLIGO HAM-ISI, Phase III Testing report (Control Commissioning), LLO HAM 3 |
Ryan DeRosa et al. |
Subsystem Test
Seismic Isolation
|
18 Jun 2014 |
E1200105-v4 |
aLIGO HAM-ISI, Pre-integration Test Report, Phase II, LLO HAM 2 |
Fabrice Matichard et al. |
Seismic Isolation
|
18 Jun 2014 |
E1101141-v1 |
Neon Leak Testing Results for Seismometer Pods installed on H2 BSC 6 |
Michael Vargas et al. |
Subsystem Test
Seismic Isolation
|
18 Jun 2014 |
E1101140-v1 |
Neon Leak Testing Results for Seismometer Pods installed on H2 BSC 8 |
Michael Vargas et al. |
Subsystem Test
Seismic Isolation
|
18 Jun 2014 |
E1101139-x0 |
Neon Leak Testing Results for Seismometer Pods installed on ISIs |
Celine Ramet |
Seismic Isolation
Installation
Subsystem Test
|
18 Jun 2014 |
E1000136-v15 |
aLIGO L4C Status Chart |
Celine Ramet |
Seismic Isolation
Subsystem Test
|
18 Jun 2014 |
Q1100073-v32 |
Seismometer and Pod Issue Tracking |
Michael Vargas et al. |
Requirements
Subsystem Test
Seismic Isolation
Assembly
|
18 Jun 2014 |
F0900070-v6 |
GS-13 Inspection Checklist |
Joe Hanson et al. |
Incoming Inspection
Seismic Isolation
Installation
Subsystem Test
|
18 Jun 2014 |
E1100395-v1 |
aLIGO GS-13 Post Modification testing results |
Jeffrey Kissel et al. |
Subsystem Test
Seismic Isolation
|
18 Jun 2014 |
E1100393-v2 |
aLIGO GS-13 as received testing results |
Jeffrey Kissel et al. |
Seismic Isolation
Subsystem Test
|
18 Jun 2014 |
E1000058-v46 |
aLIGO GS-13 Status Chart |
Jeffrey Kissel et al. |
Installation
Seismic Isolation
|
18 Jun 2014 |
E1100326-v14 |
aLIGO T 240 seismometers for BSC-ISI |
Celine Ramet |
Seismic Isolation
|
18 Jun 2014 |
E0900357-v28 |
aLIGO BSC-ISI, General Assembly Procedure |
Michael Hillard et al. |
Assembly
Seismic Isolation
|
18 Jun 2014 |
E1100995-v10 |
aLIGO HAM-ISI Testing Procedure, Phase III: Control Commissioning |
Sebastien Biscans et al. |
Subsystem Test
Seismic Isolation
|
23 Apr 2013 |
E1000325-v1 |
aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LLO Unit #1 (LIGO-MIT) |
Celine Ramet |
Subsystem Test
Seismic Isolation
|
05 Apr 2012 |
E1000327-v7 |
aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LLO Unit #3 (HAM3) |
Celine Ramet |
Final Design
Seismic Isolation
|
05 Apr 2012 |
E1000326-v5 |
aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LLO Unit #2 (HAM2) |
Celine Ramet |
Seismic Isolation
Subsystem Test
|
05 Apr 2012 |
E1000328-v2 |
aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LLO Unit #4 (HAM4) |
Celine Ramet |
Seismic Isolation
Final Design
|
05 Apr 2012 |
L0900118-v8 |
Advanced LIGO Preliminary Design Review of the BSC ISI system |
Fabrice Matichard et al. |
Reviews
Preliminary Design
Seismic Isolation
|
04 May 2011 |
D1003361-v1 |
aLIGO HEPI-HAM Sliding Clamp |
Celine Ramet |
Seismic Isolation
|
12 Jan 2011 |
D0901499-v1 |
Blade spring Post, Stage 0-1, aLIGO BSC-ISI |
Andy Stein et al. |
Seismic Isolation
Final Design
|
02 Dec 2010 |
D0902594-v3 |
Threaded Pivot, Stage 0-1 Blade Pusher, aLIGO BSC-ISI |
Celine Ramet |
Seismic Isolation
Final Design
|
21 Sep 2010 |
D0901500-v1 |
Flexure Rod Shim, Stage 0-1, aLIGO BSC ISI |
Celine Ramet et al. |
Final Design
Seismic Isolation
|
10 Sep 2010 |
D0902200-v1 |
Top Saddle on Bracket, Stage 0-1 Blade Pusher, aLIGO BSC-ISI |
Sam Barnum et al. |
Final Design
Seismic Isolation
|
27 Jul 2010 |
D0900895-v2 |
BSC-ISI Stage 0 Monolithic Half Top |
Celine Ramet |
Final Design
Seismic Isolation
|
23 Jul 2010 |
D0900894-v2 |
BSC-ISI Stage 0 Monolithic Half Bottom |
Celine Ramet |
Seismic Isolation
Final Design
|
23 Jul 2010 |
D0901755-v1 |
Flexure Cup Stage 0-1, aLIGO BSC ISI |
Celine Ramet et al. |
Seismic Isolation
Final Design
|
03 Mar 2010 |
D0901502-v1 |
Bracket Flexure Rod Shim, Stage 0-1, aLIGO BSC ISI |
Celine Ramet |
Final Design
Seismic Isolation
|
01 Mar 2010 |
D0902420-v1 |
Flexure Rod Shaft Collar Tapped Side, Stage 0-1, aLIGO BSC ISI |
Celine Ramet et al. |
Seismic Isolation
Final Design
|
01 Mar 2010 |
D0901757-v1 |
Flexure Rod, Stage 0-1, aLIGO BSC-ISI |
Celine Ramet et al. |
Seismic Isolation
Final Design
|
01 Mar 2010 |
D0902103-v1 |
Flexure Assembly, Stage 0-1, aLIGO BSC ISI |
Celine Ramet et al. |
Final Design
Seismic Isolation
|
01 Mar 2010 |
D0902593-v1 |
Pusher Pivot Assembly, Stage 0-1 Blade Pusher, aLIGO BSC-ISI |
Celine Ramet |
Seismic Isolation
Final Design
|
21 Feb 2010 |
G0900323-v2 |
Kick-off Meeting Stage 0 Redesign- Presentation |
Celine Ramet |
Conceptual Design
|
07 May 2009 |