LIGO-Number |
Title |
Author(s) |
Topic(s) |
Last Updated |
T1900649-v8 |
Frequency Dependent Squeezing Final Optical Layout |
Lee McCuller et al. |
Squeezer
A+
Sensing and Control
|
18 Dec 2020 |
D1900281-v9 |
Overview of Frequency-Dependent Squeezing layout for O4: HAM7, HAM8, SQZT0, SQZT7, SQZT8 |
Lee McCuller et al. |
Preliminary Design
A+
Squeezer
|
03 Nov 2020 |
T1900768-v4 |
SEI Roadmap - Plans and Ideas for better isolation and control for Advanced LIGO |
Brian Lantz et al. |
Seismic Isolation
|
26 Dec 2019 |
T1900777-v1 |
Reducing differential motion using CPS sensors |
Chiara DiFronzo et al. |
Seismic Isolation
|
20 Nov 2019 |
D1000895-v3 |
Plate 2 for SEI Vibration absorber - 5 Lb version |
Sebastien Biscans |
Basic R&D
Seismic Isolation
|
03 Oct 2019 |
P1200040-v55 |
Seismic Isolation of Advanced LIGO: Review of Strategy, Instrumentation, and Performance (CQG 2015) |
Fabrice Matichard et al. |
Basic R&D
Seismic Isolation
|
03 Sep 2019 |
G1800399-v1 |
Seismic Control during Earthquakes: Review of new technique |
Brian Lantz et al. |
Integration
Seismic Isolation
|
14 Dec 2018 |
E1800071-x0 |
Top Level Grouping of AMD documentation, prepared for TRB review 2017-18 |
Sebastien Biscans et al. |
System Engineering
Operations
|
27 Jul 2018 |
P1200011-v6 |
Dynamics Enhancements of Advanced LIGO Multi-Stage Active Vibration Isolators and Related Control Performance Improvement |
Fabrice Matichard et al. |
Basic R&D
Seismic Isolation
|
20 Jun 2018 |
T1500320-v2 |
Advanced interferometers strategy on earthquake pertubations |
Sebastien Biscans et al. |
Seismic Isolation
|
20 Oct 2016 |
G1500652-v2 |
LIGO/VIRGO earthquake studies and controls configurations |
Sebastien Biscans |
Activity
Sensing and Control
|
05 Jun 2015 |
G1401207-v4 |
Advanced LIGO Seismic Isolation and Control |
Brett Shapiro et al. |
Suspensions
Sensing and Control
Seismic Isolation
|
03 Apr 2015 |
E1100276-v15 |
aLIGO HEPI Testing Documentation |
Sebastien Biscans et al. |
Subsystem Test
Seismic Isolation
|
25 Mar 2015 |
E1300824-v3 |
aLIGO HEPI Assembly Validation Procedure |
Sebastien Biscans et al. |
Subsystem Test
Seismic Isolation
|
03 Mar 2015 |
T1400672-x0 |
Report from the Commissioning Workshop on Suspensions at Virgo |
Jeffrey Kissel et al. |
Seismic Isolation
Installation
Commissioning
Modelling
Meeting
Integration
Suspensions
Basic R&D
|
21 Oct 2014 |
T1200482-v2 |
aLIGO SEI / SUS Watchdog Design |
Jeffrey Kissel et al. |
Seismic Isolation
System Engineering
Installation
Data Acquisition System
Final Design
System Test
Integration
Suspensions
|
10 Jul 2014 |
E1300825-v1 |
aLIGO HEPI Control Implementation Procedure |
Sebastien Biscans et al. |
Subsystem Test
Seismic Isolation
|
18 Jun 2014 |
E1100849-v3 |
aLIGO BSC-ISI, Test Report, Phase 2, LHO Unit #5 - BSC9 - ETMX |
Jim Warner et al. |
Subsystem Test
Seismic Isolation
|
18 Jun 2014 |
E1200105-v4 |
aLIGO HAM-ISI, Pre-integration Test Report, Phase II, LLO HAM 2 |
Fabrice Matichard et al. |
Seismic Isolation
|
18 Jun 2014 |
Q1100073-v32 |
Seismometer and Pod Issue Tracking |
Michael Vargas et al. |
Seismic Isolation
Assembly
Subsystem Test
Requirements
|
18 Jun 2014 |
E1000338-v4 |
Vibration Absorber : Final Design Review |
Sebastien Biscans et al. |
Basic R&D
Suspensions
|
20 May 2014 |
E1300872-v1 |
ECR - HEPI model updates Nov 2013 |
Brian Lantz et al. |
Integration
Seismic Isolation
|
09 Dec 2013 |
E1100995-v10 |
aLIGO HAM-ISI Testing Procedure, Phase III: Control Commissioning |
Sebastien Biscans et al. |
Subsystem Test
Seismic Isolation
|
23 Apr 2013 |
E1000380-v2 |
aLIGO BSC-ISI, Stage 1-2 Horizontal Actuator Assembly Procedure |
Sebastien Biscans |
Final Design
Seismic Isolation
|
04 Dec 2012 |
E1000393-v3 |
aLIGO BSC-ISI, Stage 0-1 Horizontal Actuator Assembly Procedure |
Sebastien Biscans et al. |
Seismic Isolation
Final Design
|
04 Dec 2012 |
D1001760-v2 |
Stage 1 Vibration Absorber (door) |
Sebastien Biscans et al. |
Seismic Isolation
Final Design
|
04 Sep 2012 |
D1001758-v2 |
Mass for Stage 1 Vibration Absorber |
Sebastien Biscans |
Seismic Isolation
Basic R&D
|
27 Jul 2012 |
D1001764-v2 |
Right clamp for Stage 1 Vibration Absorber |
Sebastien Biscans |
Basic R&D
Seismic Isolation
|
17 Jul 2012 |
D1001759-v2 |
Left clamp for Stage 1 Vibration Absorber |
Sebastien Biscans |
Seismic Isolation
Basic R&D
|
17 Jul 2012 |
E1000387-v4 |
aLIGO BSC-ISI, Stage 1-2 Vertical Actuator Assembly Procedure |
Sebastien Biscans et al. |
Seismic Isolation
Final Design
|
21 Oct 2011 |
D0901197-v3 |
Spring Post Assembly, Stage 0-1, aLIGO BSC-ISI |
Andy Stein et al. |
Seismic Isolation
Final Design
|
12 Jul 2011 |
E1100634-v1 |
aLIGO BSC-ISI Actuators - List of Actuators on which they are installed |
Sebastien Biscans |
Seismic Isolation
Basic R&D
|
05 Jul 2011 |
D0902485-v3 |
Stage1-2 Blade Spring Flexure Assem, aLIGO BSC-ISI |
Sam Barnum et al. |
Final Design
Seismic Isolation
|
14 Jun 2011 |
E1100509-x0 |
New Angled Blade Spacer |
Sebastien Biscans |
Basic R&D
Seismic Isolation
|
06 Jun 2011 |
D1003241-v1 |
Washer for GS13 feet |
Sebastien Biscans |
Seismic Isolation
Basic R&D
|
10 May 2011 |
D1001757-v1 |
Top clamp for Stage 1 Vibration Absorber |
Sebastien Biscans |
Basic R&D
Seismic Isolation
|
16 Mar 2011 |
E1100092-x0 |
DCN for D1001760- v1, related parts, and assemblies |
Sebastien Biscans |
Seismic Isolation
Basic R&D
|
14 Mar 2011 |
D1100087-v1 |
Custom Bolted Nut, GS-13 Diaphragm, New Design |
Sebastien Biscans |
Basic R&D
Seismic Isolation
|
04 Feb 2011 |
D1100086-v1 |
GS-13 Bolted Stabilizer Plate |
Sebastien Biscans |
Basic R&D
Seismic Isolation
|
04 Feb 2011 |
D1100088-v1 |
Gs13 Stabilizer and Custom Bolted Nuts |
Sebastien Biscans |
Seismic Isolation
Basic R&D
|
27 Jan 2011 |
D1001527-v2 |
GS13 Cover - Mu Metal |
Sebastien Biscans |
Seismic Isolation
Final Design
|
07 Jan 2011 |
D1001535-v2 |
GS13 Top Hat MuMetal - Magnetically Shielded |
Sebastien Biscans |
Seismic Isolation
Final Design
|
07 Dec 2010 |
D1003192-x0 |
Tungsten Mass for Stage 1 Vibration Absorber (door) |
Sebastien Biscans |
Seismic Isolation
Basic R&D
|
03 Dec 2010 |
D1002944-x0 |
Mi Model Cable 3 |
Sebastien Biscans |
Basic R&D
Seismic Isolation
|
03 Nov 2010 |
D1002942-x0 |
Mi Model Cable 1 |
Sebastien Biscans |
Basic R&D
Seismic Isolation
|
03 Nov 2010 |
D1002833-x0 |
MuMetal Patch for GS13 |
Sebastien Biscans |
Basic R&D
Seismic Isolation
|
26 Oct 2010 |
D1002815-x0 |
Modified Trillium Pod Interposer |
Sebastien Biscans |
Basic R&D
Seismic Isolation
|
25 Oct 2010 |
D1002814-x0 |
Modified Trillium Custom Interface Circuit Board |
Sebastien Biscans |
Basic R&D
Seismic Isolation
|
25 Oct 2010 |
D1002809-x0 |
Trillium Pod with Magnetically Shielded Bell |
Sebastien Biscans |
Basic R&D
Seismic Isolation
|
22 Oct 2010 |
E1000623-v1 |
Stage 1 + Sensors Structural Testing |
Sebastien Biscans |
Seismic Isolation
Basic R&D
|
21 Oct 2010 |
D1002734-x0 |
Base of Bell MuMetal - Magnetically Shielded |
Sebastien Biscans |
Basic R&D
Seismic Isolation
|
15 Oct 2010 |
G1000815-v1 |
Passive damping solutions for the BSC-ISI and Quadruple Pendulum structural modes |
Sebastien Biscans et al. |
Seismic Isolation
Basic R&D
|
15 Sep 2010 |
P1000098-v1 |
Internship report - Study of passive damping techniques to improve the performance of the SEI system |
Sebastien Biscans |
Basic R&D
Seismic Isolation
|
10 Sep 2010 |
D1001652-x0 |
Bell MuMetal - Magnetically Shielded version 2 |
Sebastien Biscans |
Final Design
Seismic Isolation
|
28 Jun 2010 |
D1001651-x0 |
Bell MuMetal - Magnetically Shielded version 1 |
Sebastien Biscans |
Final Design
Seismic Isolation
|
28 Jun 2010 |
D1001533-x0 |
GS13 Screw for GS13 Magnetically Shielded |
Sebastien Biscans |
Seismic Isolation
Final Design
|
14 Jun 2010 |
D1001529-x0 |
GS13 Interposer -Magnetical shield |
Sebastien Biscans |
Seismic Isolation
Final Design
|
12 Jun 2010 |
D1001526-x0 |
Vertical GS13 Seismometer - Magnetically Shielded |
Sebastien Biscans |
Final Design
Seismic Isolation
|
12 Jun 2010 |