LIGO-Number Title Author(s) Topic(s) Last Updated
T1900649-v8 Frequency Dependent Squeezing Final Optical Layout Lee McCuller et al. Squeezer
A+
Sensing and Control
18 Dec 2020
D1900281-v9 Overview of Frequency-Dependent Squeezing layout for O4: HAM7, HAM8, SQZT0, SQZT7, SQZT8 Lee McCuller et al. Preliminary Design
A+
Squeezer
03 Nov 2020
T1900768-v4 SEI Roadmap - Plans and Ideas for better isolation and control for Advanced LIGO Brian Lantz et al. Seismic Isolation
26 Dec 2019
T1900777-v1 Reducing differential motion using CPS sensors Chiara DiFronzo et al. Seismic Isolation
20 Nov 2019
D1000895-v3 Plate 2 for SEI Vibration absorber - 5 Lb version Sebastien Biscans Basic R&D
Seismic Isolation
03 Oct 2019
P1200040-v55 Seismic Isolation of Advanced LIGO: Review of Strategy, Instrumentation, and Performance (CQG 2015) Fabrice Matichard et al. Basic R&D
Seismic Isolation
03 Sep 2019
G1800399-v1 Seismic Control during Earthquakes: Review of new technique Brian Lantz et al. Integration
Seismic Isolation
14 Dec 2018
E1800071-x0 Top Level Grouping of AMD documentation, prepared for TRB review 2017-18 Sebastien Biscans et al. System Engineering
Operations
27 Jul 2018
P1200011-v6 Dynamics Enhancements of Advanced LIGO Multi-Stage Active Vibration Isolators and Related Control Performance Improvement Fabrice Matichard et al. Basic R&D
Seismic Isolation
20 Jun 2018
T1500320-v2 Advanced interferometers strategy on earthquake pertubations Sebastien Biscans et al. Seismic Isolation
20 Oct 2016
G1500652-v2 LIGO/VIRGO earthquake studies and controls configurations Sebastien Biscans Activity
Sensing and Control
05 Jun 2015
G1401207-v4 Advanced LIGO Seismic Isolation and Control Brett Shapiro et al. Suspensions
Sensing and Control
Seismic Isolation
03 Apr 2015
E1100276-v15 aLIGO HEPI Testing Documentation Sebastien Biscans et al. Subsystem Test
Seismic Isolation
25 Mar 2015
E1300824-v3 aLIGO HEPI Assembly Validation Procedure Sebastien Biscans et al. Subsystem Test
Seismic Isolation
03 Mar 2015
T1400672-x0 Report from the Commissioning Workshop on Suspensions at Virgo Jeffrey Kissel et al. Seismic Isolation
Installation
Commissioning
Modelling
Meeting
Integration
Suspensions
Basic R&D
21 Oct 2014
T1200482-v2 aLIGO SEI / SUS Watchdog Design Jeffrey Kissel et al. Seismic Isolation
System Engineering
Installation
Data Acquisition System
Final Design
System Test
Integration
Suspensions
10 Jul 2014
E1300825-v1 aLIGO HEPI Control Implementation Procedure Sebastien Biscans et al. Subsystem Test
Seismic Isolation
18 Jun 2014
E1100849-v3 aLIGO BSC-ISI, Test Report, Phase 2, LHO Unit #5 - BSC9 - ETMX Jim Warner et al. Subsystem Test
Seismic Isolation
18 Jun 2014
E1200105-v4 aLIGO HAM-ISI, Pre-integration Test Report, Phase II, LLO HAM 2 Fabrice Matichard et al. Seismic Isolation
18 Jun 2014
Q1100073-v32 Seismometer and Pod Issue Tracking Michael Vargas et al. Seismic Isolation
Assembly
Subsystem Test
Requirements
18 Jun 2014
E1000338-v4 Vibration Absorber : Final Design Review Sebastien Biscans et al. Basic R&D
Suspensions
20 May 2014
E1300872-v1 ECR - HEPI model updates Nov 2013 Brian Lantz et al. Integration
Seismic Isolation
09 Dec 2013
E1100995-v10 aLIGO HAM-ISI Testing Procedure, Phase III: Control Commissioning Sebastien Biscans et al. Subsystem Test
Seismic Isolation
23 Apr 2013
E1000380-v2 aLIGO BSC-ISI, Stage 1-2 Horizontal Actuator Assembly Procedure Sebastien Biscans Final Design
Seismic Isolation
04 Dec 2012
E1000393-v3 aLIGO BSC-ISI, Stage 0-1 Horizontal Actuator Assembly Procedure Sebastien Biscans et al. Seismic Isolation
Final Design
04 Dec 2012
D1001760-v2 Stage 1 Vibration Absorber (door) Sebastien Biscans et al. Seismic Isolation
Final Design
04 Sep 2012
D1001758-v2 Mass for Stage 1 Vibration Absorber Sebastien Biscans Seismic Isolation
Basic R&D
27 Jul 2012
D1001764-v2 Right clamp for Stage 1 Vibration Absorber Sebastien Biscans Basic R&D
Seismic Isolation
17 Jul 2012
D1001759-v2 Left clamp for Stage 1 Vibration Absorber Sebastien Biscans Seismic Isolation
Basic R&D
17 Jul 2012
E1000387-v4 aLIGO BSC-ISI, Stage 1-2 Vertical Actuator Assembly Procedure Sebastien Biscans et al. Seismic Isolation
Final Design
21 Oct 2011
D0901197-v3 Spring Post Assembly, Stage 0-1, aLIGO BSC-ISI Andy Stein et al. Seismic Isolation
Final Design
12 Jul 2011
E1100634-v1 aLIGO BSC-ISI Actuators - List of Actuators on which they are installed Sebastien Biscans Seismic Isolation
Basic R&D
05 Jul 2011
D0902485-v3 Stage1-2 Blade Spring Flexure Assem, aLIGO BSC-ISI Sam Barnum et al. Final Design
Seismic Isolation
14 Jun 2011
E1100509-x0 New Angled Blade Spacer Sebastien Biscans Basic R&D
Seismic Isolation
06 Jun 2011
D1003241-v1 Washer for GS13 feet Sebastien Biscans Seismic Isolation
Basic R&D
10 May 2011
D1001757-v1 Top clamp for Stage 1 Vibration Absorber Sebastien Biscans Basic R&D
Seismic Isolation
16 Mar 2011
E1100092-x0 DCN for D1001760- v1, related parts, and assemblies Sebastien Biscans Seismic Isolation
Basic R&D
14 Mar 2011
D1100087-v1 Custom Bolted Nut, GS-13 Diaphragm, New Design Sebastien Biscans Basic R&D
Seismic Isolation
04 Feb 2011
D1100086-v1 GS-13 Bolted Stabilizer Plate Sebastien Biscans Basic R&D
Seismic Isolation
04 Feb 2011
D1100088-v1 Gs13 Stabilizer and Custom Bolted Nuts Sebastien Biscans Seismic Isolation
Basic R&D
27 Jan 2011
D1001527-v2 GS13 Cover - Mu Metal Sebastien Biscans Seismic Isolation
Final Design
07 Jan 2011
D1001535-v2 GS13 Top Hat MuMetal - Magnetically Shielded Sebastien Biscans Seismic Isolation
Final Design
07 Dec 2010
D1003192-x0 Tungsten Mass for Stage 1 Vibration Absorber (door) Sebastien Biscans Seismic Isolation
Basic R&D
03 Dec 2010
D1002944-x0 Mi Model Cable 3 Sebastien Biscans Basic R&D
Seismic Isolation
03 Nov 2010
D1002942-x0 Mi Model Cable 1 Sebastien Biscans Basic R&D
Seismic Isolation
03 Nov 2010
D1002833-x0 MuMetal Patch for GS13 Sebastien Biscans Basic R&D
Seismic Isolation
26 Oct 2010
D1002815-x0 Modified Trillium Pod Interposer Sebastien Biscans Basic R&D
Seismic Isolation
25 Oct 2010
D1002814-x0 Modified Trillium Custom Interface Circuit Board Sebastien Biscans Basic R&D
Seismic Isolation
25 Oct 2010
D1002809-x0 Trillium Pod with Magnetically Shielded Bell Sebastien Biscans Basic R&D
Seismic Isolation
22 Oct 2010
E1000623-v1 Stage 1 + Sensors Structural Testing Sebastien Biscans Seismic Isolation
Basic R&D
21 Oct 2010
D1002734-x0 Base of Bell MuMetal - Magnetically Shielded Sebastien Biscans Basic R&D
Seismic Isolation
15 Oct 2010
G1000815-v1 Passive damping solutions for the BSC-ISI and Quadruple Pendulum structural modes Sebastien Biscans et al. Seismic Isolation
Basic R&D
15 Sep 2010
P1000098-v1 Internship report - Study of passive damping techniques to improve the performance of the SEI system Sebastien Biscans Basic R&D
Seismic Isolation
10 Sep 2010
D1001652-x0 Bell MuMetal - Magnetically Shielded version 2 Sebastien Biscans Final Design
Seismic Isolation
28 Jun 2010
D1001651-x0 Bell MuMetal - Magnetically Shielded version 1 Sebastien Biscans Final Design
Seismic Isolation
28 Jun 2010
D1001533-x0 GS13 Screw for GS13 Magnetically Shielded Sebastien Biscans Seismic Isolation
Final Design
14 Jun 2010
D1001529-x0 GS13 Interposer -Magnetical shield Sebastien Biscans Seismic Isolation
Final Design
12 Jun 2010
D1001526-x0 Vertical GS13 Seismometer - Magnetically Shielded Sebastien Biscans Final Design
Seismic Isolation
12 Jun 2010

Number of documents found: 58