LIGO-Number | Title | Author(s) | Topic(s) | Last Updated |
---|---|---|---|---|
T1300757-v1 | Results from x arm accumulation at LLO August 28-31, 2013 | Michael Fyffe et al. | Operations Vacuum |
04 Oct 2025 |
T1301007-v1 | Results from the X- arm accumulation at LLO on Dec 16-18, 2013 | Tomeeka Lewis et al. | Vacuum |
04 Oct 2025 |
T1300087-v1 | Beamtube recovery technical document repository | Michael Zucker et al. | Operations Vacuum |
04 Oct 2025 |
E1000046-v1 | Vacuum System Viton O-ring Procurement Specification | John Worden et al. | Vacuum |
02 Mar 2023 |
T1200518-v1 | Leak localization of the Y arm beamtube at LLO | Michael Meyer et al. | Vacuum System Test |
06 Jul 2020 |
E1900300-v1 | FTIR - aLIGO, PCAL-VIDEO CAM, PERISCOPE SHIELD (OUTER PANEL) | Adam Branch et al. | Cleaning System Engineering |
25 Sep 2019 |
T1800253-v1 | LCP-4 (cryo-trap) Internal Photos (Livingston) | Scott McCormick et al. | Quality Assurance Vacuum Operations System Engineering |
09 Jul 2018 |
Number of documents found: 7
DCC Version 3.5.2, contact
DCC Help