2) Must be used in conjunction with relevant Top Level Installation Procedure, Cartridge Hazard Analysis, relevant Critical Lift Plan and relevant Cartridge Flight Document.
i) TOP LEVEL INSTALLATION PROCEDURES
LIGO-E1200023: aLIGO Chamber Chamber (Top Level) Installation Procedures
ii) CARTRIDGE HAZARD ANALYSIS
LIGO-E1200925: BSC Cartridge Installation Hazard Analysis, aLIGO
iii) CRITICAL LIFT PLANS (Refer to LIGO-E1200901)
LIGO-E1200950: Critical Lift Plan for the aLIGO BSC1-L1 Cartridge Installation
LIGO-E1200328: Critical Lift Plan for the aLIGO BSC2-L1 Cartridge Installation
LIGO-E1200275: Critical lift plan for the aLIGO BSC6 cartridge installation
LIGO-E1100988: Critical lift plan for the aLIGO BSC8 cartridge installation
iv) CARTRIDGE FLIGHT DOCUMENTS (REFER TO LIGO-E1200900)
LIGO-E1200927: BSC1-L1 Requirements and Procedure, Cartridge Flight and Insertion into BSC Chambers, aLIGO
LIGO-E1200322: BSC2-L1 Requirements and Procedure, Cartridge Flight and Insertion into BSC Chambers, aLIGO
LIGO-E1100278: BSC6-H2 Requirements and Procedure, Cartridge Flight and Insertion into BSC Chambers, aLIGO
LIGO-E1101016: BSC8 H2, Requirements and Procedure, Cartridge Flight and Insertion into BSC Chamber, aLIGO
DCC Version 3.5.1, contact
DCC Help