PUNCH LIST - 1) Transfer function data noisy. This is due to result performed on free standing stand. Accepted but noted. No Action.
SIGNED - Calum Torrie signature on 2nd April 2014 closes this Acceptance Doc on behalf of chair and committee .
Punchlist items and their resolution will be tracked in T1400181. They will not be updated on this Acceptance Document filecard.
II. Documents for Review (against list from M1100282)
Top Assembly Name:
DOES NOT EXIST YET AdvLIGO SUS BSC2-I1, XYZ Local CS for BS HR assembly
QUESTION TO REVIEWERS - Will systems be creating layouts for I1? Or do we "accept" it without it?
ACCEPT WITHOUT. CIT. SYSTEMS WILL NOT BE CREATING I1 LAYOUT AT THIS POINT.
ICS Assembly #:
- ICS Assembly Load: https://ics-redux.ligo-la.caltech.edu/JIRA/browse/ASSY-D1000392-002
DONE. CLOSED.
Acceptance document:
This filecard serves as the acceptance document for 3rd IFO BS.
For common material for all BSFM suspensions, see
https://dcc.ligo.org/LIGO-E1201039
ICS inventory
ACTION - All to "find" an item and comment on success and structure
ACCEPTED. CIT.
S-numbers
Electronics for I1 have been inventoried, but Rack Layouts and/or individual S numbers have not yet been assigned to specific HSTSs.
QUESTION TO REVIEWERS - Is this OK? Should we dig up chassis test reports performed by CDS? I think chassis are being stored in Racks in the H2 Electronics Room; seems like we could treat them as though that was their "installed" location, and treat the inventory as LLO has with a DCC tree structure.
ACCEPT WITHOUT. CIT.
Test results:
- Calibrated, M1toM1 Transfer Functions (DAMPING OFF):
https://alog.ligo-wa.caltech.edu/aLOG/index.php?callRep=4312
- Calibrated, M1toM1 Transfer Functions (DAMPING ON):
https://alog.ligo-wa.caltech.edu/aLOG/index.php?callRep=4312
- Calibrated, M2toM2 Transfer Functions (DAMPING OFF):
DOES NOT EXIST YET (Not a part of Phase 1 Testing)
- Calibrated, M2toM2 Transfer Functions (DAMPING ON):
DOES NOT EXIST YET (Not a part of Phase 1 Testing)
- Calibrated OSEM Sensor ASDs, All Stages (DAMPING OFF):
https://alog.ligo-wa.caltech.edu/aLOG/index.php?callRep=4312
- Calibrated OSEM Sensor ASDs, All Stages (DAMPING ON):
https://alog.ligo-wa.caltech.edu/aLOG/index.php?callRep=4312
- B&K Hammer Cage Resonance Transfer Functions:
DOES NOT EXIST YET (Not a part of Phase 1 Testing)
- Coil Driver Noise: https://alog.ligo-la.caltech.edu/aLOG/index.php?callRep=4751
- Coil Driver Response in all states: https://alog.ligo-la.caltech.edu/aLOG/index.php?callRep=4495
Noise measurements presented are for MC2, however, the Beamsplitter uses the same coil drivers and we would therefore expect identical performance.
- Violin Mode Frequencies and Q
Not required for fabrication acceptance. However, SUS will be doing 1 of each of each type when time permits.
- Violin mode frequency measured: https://alog.ligo-la.caltech.edu/aLOG/index.php?callRep=9282
- Violin mode model prediction available: see T1300876
Channel/Signal List and Calibrations
For latest measurements of OSEM Sensor's Open Light Current, See https://dcc.ligo.org/LIGO-E1200343
Otherwise calibrations are assumed to be as shown in BSFM Control Design Description,
https://dcc.ligo.org/LIGO-T1100479
with a roughly 20% uncertainty (determined by the worst discrepancy seen between modelled and measured transfer functions across all DOFs and many BSFMs).
III. General notes and action items:
- The review team should review E1201039 in detail - unless the SUS Acceptance format changes and E1201039 is no longer the preferred method of presenting this info. TBD.