Document List by Author
Home
Recent Changes
Topics
Login
Arnaud Pele
of LIGO - Hanford Observatory
is listed as an author on the following documents:
LIGO-Number
Title
Author(s)
Topic(s)
Last Updated
E1100187-v6
LIGO Music Wire Specification.
Calum Torrie
et al.
Suspensions
System Engineering
Requirements
15 Feb 2024
G2101943-v1
September 2021 scattering mitigation and PEM update
Robert Schofield
et al.
Auxiliary Optics
06 Sep 2021
T1800485-v6
U200 Mount Damping Study
Craig Worley
et al.
Input Optics
Basic R&D
04 Sep 2020
P1800038-v4
Towards windproofing LIGO: Reducing the effect of wind-driven floor tilt by using rotation sensors in active seismic isolation.
Krishna Venkateswara
et al.
Basic R&D
Seismic Isolation
12 Mar 2020
G1801687-v1
BRS integration to ISI
Arnaud Pele
et al.
Seismic Isolation
25 Feb 2020
T1900768-v4
SEI Roadmap - Plans and Ideas for better isolation and control for Advanced LIGO
Brian Lantz
et al.
Seismic Isolation
26 Dec 2019
T1900777-v1
Reducing differential motion using CPS sensors
Chiara DiFronzo
et al.
Seismic Isolation
20 Nov 2019
G1901122-v3
Lockloss status at beginning of O3 (LLO)
Arnaud Pele
Commissioning
Detector Characterization
19 Nov 2019
E1200068-v18
aLIGO SEI STS and T240 Ground Seismometer Inventory
Celine Ramet
et al.
Seismic Isolation
Installation
01 Aug 2016
T1900321-v1
Benefits of the trees around the LIGO Livingston Buildings
Brian Lantz
et al.
Observatory Facilities
Seismic Isolation
30 May 2019
T1800066-v2
typical motion of HAM Suspension points in O2
Brian Lantz
et al.
Installation
Seismic Isolation
17 Dec 2018
G1800399-v1
Seismic Control during Earthquakes: Review of new technique
Brian Lantz
et al.
Seismic Isolation
Integration
14 Dec 2018
G1802012-v3
Status of Beam Rotation Sensors at LLO
Krishna Venkateswara
et al.
Seismic Isolation
Basic R&D
19 Nov 2018
T1700343-v1
Non-Linear Angular Noise Coupling into Differential Arm Length
Brian Seymour
et al.
Sensing and Control
19 Feb 2018
T1600586-v4
O1 LLO Wind Study
Arnaud Pele
et al.
Seismic Isolation
Commissioning
21 Dec 2016
E1600169-x0
HAM Auxiliary suspensions design and testing documentation
Giacomo Ciani
et al.
Input Optics
03 Jun 2016
E1200343-v96
OSEM Chart
Stuart Aston
et al.
Suspensions
Subsystem Test
Assembly
22 Oct 2015
G1401207-v4
Advanced LIGO Seismic Isolation and Control
Brett Shapiro
et al.
Suspensions
Seismic Isolation
Sensing and Control
03 Apr 2015
E1400151-x0
3rd IFO SUS ETMY Acceptance Document
Norna Robertson
et al.
Suspensions
11 Feb 2015
E1400150-x0
3rd IFO SUS ETMX Acceptance Document
Norna Robertson
et al.
Suspensions
11 Feb 2015
E1400149-x0
3rd IFO SUS ITMY Acceptance Document
Norna Robertson
et al.
Suspensions
11 Feb 2015
E1400148-x0
3rd IFO SUS ITMX Acceptance Document
Norna Robertson
et al.
Suspensions
11 Feb 2015
E1400146-x0
H1 SUS ITMX Acceptance Document
Norna Robertson
et al.
Suspensions
11 Feb 2015
E1400147-x0
H1 SUS ITMY Acceptance Document
Norna Robertson
et al.
Suspensions
11 Feb 2015
E1400161-v1
H1 SUS HLTS SR3 Acceptance Document
Norna Robertson
et al.
Suspensions
06 Nov 2014
T1400672-x0
Report from the Commissioning Workshop on Suspensions at Virgo
Jeffrey Kissel
et al.
Commissioning
Installation
Meeting
Seismic Isolation
Suspensions
Modelling
Basic R&D
Integration
21 Oct 2014
E1400124-v1
H1 SUS HSTS SR2 Acceptance Document
Norna Robertson
et al.
Suspensions
05 Sep 2014
E1400123-v1
H1 SUS HSTS SRM Acceptance Document
Norna Robertson
et al.
Suspensions
05 Sep 2014
E1400122-v2
H1 SUS HSTS PR2 Acceptance Document
Norna Robertson
et al.
Suspensions
05 Sep 2014
E1400121-v4
H1 SUS HSTS PRM Acceptance Document
Norna Robertson
et al.
Suspensions
05 Sep 2014
E1400120-v3
H1 SUS HSTS MC3 Acceptance Document
Norna Robertson
et al.
Suspensions
05 Sep 2014
E1400118-v2
H1 SUS HSTS MC1 Acceptance Document
Norna Robertson
et al.
Suspensions
05 Sep 2014
E1400119-v1
H1 SUS HSTS MC2 Acceptance Document
Norna Robertson
et al.
Suspensions
05 Sep 2014
E1400129-x0
3rd IFO SUS HSTS SR2 Acceptance Document
Norna Robertson
et al.
Suspensions
05 Sep 2014
E1400128-x0
3rd IFO SUS HSTS SRM Acceptance Document
Norna Robertson
et al.
Suspensions
05 Sep 2014
E1400127-x0
3rd IFO SUS HSTS PR2 Acceptance Document
Norna Robertson
et al.
Suspensions
05 Sep 2014
E1400126-x0
3rd IFO SUS HSTS MC3 Acceptance Document
Norna Robertson
et al.
Suspensions
05 Sep 2014
E1400125-x0
3rd IFO SUS HSTS MC2 Acceptance Document
Norna Robertson
et al.
Suspensions
05 Sep 2014
E1400157-x0
3rd IFO SUS BS Acceptance Document
Norna Robertson
et al.
Suspensions
04 Sep 2014
E1400159-x0
3rd IFO SUS HLTS PR3 Acceptance Document
Norna Robertson
et al.
Suspensions
04 Sep 2014
E1400160-x0
3rd IFO SUS HLTS SR3 Acceptance Document
Norna Robertson
et al.
Suspensions
30 Apr 2014
E1400158-x0
3rd IFO SUS OMC Acceptance Document
Norna Robertson
et al.
Suspensions
30 Apr 2014
T1400293-x0
Suspension Alignment Offsets and Gains
Mark Barton
et al.
Modelling
Suspensions
21 Apr 2014
T1300435-v1
Suspension Module Guardian Design
Jeffrey Kissel
et al.
Preliminary Design
Commissioning
State Control and Monitoring
Suspensions
20 Jan 2014
E1300502-x0
H1 SUS MC1 Acceptance Document
Arnaud Pele
et al.
Suspensions
30 May 2013
E1300505-x0
H1 SUS MC2 Acceptance Document
Mark Barton
et al.
Suspensions
30 May 2013
E1300504-x0
H1 SUS MC3 Acceptance document
Mark Barton
et al.
Suspensions
30 May 2013
Number of documents found: 47
Home
Recent Changes
Topics
Login
DCC
Version 3.5.0
, contact
DCC Help