Document List by Author
Home
Recent Changes
Topics
Login
Steve Vass
of LIGO - California Institute of Technology
is listed as an author on the following documents:
LIGO-Number
Title
Author(s)
Topic(s)
Last Updated
P060007-x0
Measurement of Optical Response of a Detuned Resonant Sideband Extraction Interferometer
Benjamin Abbott
et al.
Document Migration
11 Nov 2021
E1700016-v9
Specification : 40m dichroic RC folding mirrors
Gautam Venugopalan
et al.
Basic R&D
Upgrades
28 Jun 2017
D1700186-v4
Ruby Stand-off for SOS
Steve Vass
et al.
Suspensions
Fabrication
21 Apr 2017
D1600173-v3
Sapphire Stand-off for SOS
Koji Arai
et al.
Basic R&D
Suspensions
13 Apr 2017
G1300950-v1
Length sensing and control of the Caltech 40m prototype
Rana Adhikari
et al.
Basic R&D
Meeting
Sensing and Control
20 Sep 2013
G1100805-v1
Overview of the projects at Caltech 40-m prototype
Koji Arai
et al.
Meeting
Sensing and Control
09 Jul 2011
E080426-v1
Advanced LIGO ERGO Arm Hazard Analysis
Gregg Harry
et al.
Installation
Core Optics
06 Mar 2009
P070125-x0
dc readout experiment at the Caltech 40m prototype interferometer
Robert Ward
et al.
Public relations
Document Migration
19 Oct 2009
P070049-x0
A quantum-enhanced prototype gravitational-wave detector
Robert Ward
et al.
Document Migration
Public relations
14 Oct 2009
G0900520-v2
Testing Advanced LIGO length sensing and control scheme at the Caltech 40m interferometer
David Yeaton-Massey
et al.
Upgrades
30 Jun 2009
G060402-x0
Caltech 40m Lab Update - LSC Meeting, August 14-17th, 2006 @ Louisiana State University
Benjamin Abbott
et al.
Document Migration
18 Aug 2006
G060127-x0
Results of 40m prototype - LSC Meeting, March 19-22, 2006, Hanford WA
Benjamin Abbott
et al.
Document Migration
14 Apr 2006
G050568-x0
Optical Spring and Optical Resonance in the 40m Detuned RSE Interferometer
Benjamin Abbott
et al.
Document Migration
31 Oct 2005
G050324-x0
Plans for DC Readout Experiment at the 40m Lab
Benjamin Abbott
et al.
Document Migration
08 Sep 2005
T030245-x0
LIGO Caltech 40-Meter PSL Supplemental Report
Benjamin Abbott
et al.
Document Migration
10 Aug 2004
T040119-x0
Mach-Zehnder interferometer for Advanced-LIGO optical configurations to eliminate sidebands of sidebands
Bryan Barr
et al.
Document Migration
10 Aug 2004
G040081-x0
40m Laboratory Upgrade Progress Report - LSC Meeting, March 15 - 18th, Livingston, LA
Benjamin Abbott
et al.
Document Migration
18 Mar 2004
T020147-x0
Characterizing the length sensing and control system of the mode cleaner in the LIGO 40m lab
Benjamin Abbott
et al.
Document Migration
08 Oct 2002
T010145-x0
LIGO Caltech 40-Meter PSL Commissioning Report
Benjamin Abbott
et al.
Document Migration
05 Dec 2001
T010115-x0
Conceptual Design of the 40 meter Laboratory Upgrade for Prototyping a Advanced LIGO Interferometer
Benjamin Abbott
et al.
Document Migration
26 Nov 2001
T010028-x0
Performance of STACIS Seismic Isolation System at the 40 Meter Lab
Larry Jones
et al.
Document Migration
13 Mar 2001
G000423-x0
Low-Frequency Operation of Interferometers - Potential for LIGO and First Tests with Coupled Suspensions
Steven Augst
et al.
Document Migration
28 Feb 2001
T000126-x0
Vacuum Pressure at the 40 Meter and the New Output Optic Chamber
Dennis Ugolini
et al.
Document Migration
28 Nov 2000
T000057-x0
Proposal for Reorganization of 40m Computing
Dennis Ugolini
et al.
Document Migration
18 May 2000
T000054-x0
Upgrade of the 40m Vacuum System
T Jou
et al.
Document Migration
18 May 2000
T000055-x0
Proposal for Upgrade of 40m Prototype - Large Seismic Stacks, and Bakeout
Dennis Ugolini
et al.
Document Migration
18 May 2000
T000058-x0
Measurement of Seismic Motion at 40m and Transfer Function of Seismic Stacks
Dennis Ugolini
et al.
Document Migration
18 May 2000
G000098-x0
Sept. 1999 40M Data Run
Stuart Anderson
et al.
Document Migration
11 May 2000
Number of documents found: 28
Home
Recent Changes
Topics
Login
DCC
Version 3.5.0
, contact
DCC Help