Document List by Author

Steve Vass of LIGO - California Institute of Technology is listed as an author on the following documents:

LIGO-Number Title Author(s) Topic(s) Last Updated
P060007-x0 Measurement of Optical Response of a Detuned Resonant Sideband Extraction Interferometer Benjamin Abbott et al. Document Migration
11 Nov 2021
E1700016-v9 Specification : 40m dichroic RC folding mirrors Gautam Venugopalan et al. Basic R&D
Upgrades
28 Jun 2017
D1700186-v4 Ruby Stand-off for SOS Steve Vass et al. Suspensions
Fabrication
21 Apr 2017
D1600173-v3 Sapphire Stand-off for SOS Koji Arai et al. Basic R&D
Suspensions
13 Apr 2017
G1300950-v1 Length sensing and control of the Caltech 40m prototype Rana Adhikari et al. Basic R&D
Meeting
Sensing and Control
20 Sep 2013
G1100805-v1 Overview of the projects at Caltech 40-m prototype Koji Arai et al. Meeting
Sensing and Control
09 Jul 2011
E080426-v1 Advanced LIGO ERGO Arm Hazard Analysis Gregg Harry et al. Installation
Core Optics
06 Mar 2009
P070125-x0 dc readout experiment at the Caltech 40m prototype interferometer Robert Ward et al. Public relations
Document Migration
19 Oct 2009
P070049-x0 A quantum-enhanced prototype gravitational-wave detector Robert Ward et al. Document Migration
Public relations
14 Oct 2009
G0900520-v2 Testing Advanced LIGO length sensing and control scheme at the Caltech 40m interferometer David Yeaton-Massey et al. Upgrades
30 Jun 2009
G060402-x0 Caltech 40m Lab Update - LSC Meeting, August 14-17th, 2006 @ Louisiana State University Benjamin Abbott et al. Document Migration
18 Aug 2006
G060127-x0 Results of 40m prototype - LSC Meeting, March 19-22, 2006, Hanford WA Benjamin Abbott et al. Document Migration
14 Apr 2006
G050568-x0 Optical Spring and Optical Resonance in the 40m Detuned RSE Interferometer Benjamin Abbott et al. Document Migration
31 Oct 2005
G050324-x0 Plans for DC Readout Experiment at the 40m Lab Benjamin Abbott et al. Document Migration
08 Sep 2005
T030245-x0 LIGO Caltech 40-Meter PSL Supplemental Report Benjamin Abbott et al. Document Migration
10 Aug 2004
T040119-x0 Mach-Zehnder interferometer for Advanced-LIGO optical configurations to eliminate sidebands of sidebands Bryan Barr et al. Document Migration
10 Aug 2004
G040081-x0 40m Laboratory Upgrade Progress Report - LSC Meeting, March 15 - 18th, Livingston, LA Benjamin Abbott et al. Document Migration
18 Mar 2004
T020147-x0 Characterizing the length sensing and control system of the mode cleaner in the LIGO 40m lab Benjamin Abbott et al. Document Migration
08 Oct 2002
T010145-x0 LIGO Caltech 40-Meter PSL Commissioning Report Benjamin Abbott et al. Document Migration
05 Dec 2001
T010115-x0 Conceptual Design of the 40 meter Laboratory Upgrade for Prototyping a Advanced LIGO Interferometer Benjamin Abbott et al. Document Migration
26 Nov 2001
T010028-x0 Performance of STACIS Seismic Isolation System at the 40 Meter Lab Larry Jones et al. Document Migration
13 Mar 2001
G000423-x0 Low-Frequency Operation of Interferometers - Potential for LIGO and First Tests with Coupled Suspensions Steven Augst et al. Document Migration
28 Feb 2001
T000126-x0 Vacuum Pressure at the 40 Meter and the New Output Optic Chamber Dennis Ugolini et al. Document Migration
28 Nov 2000
T000057-x0 Proposal for Reorganization of 40m Computing Dennis Ugolini et al. Document Migration
18 May 2000
T000054-x0 Upgrade of the 40m Vacuum System T Jou et al. Document Migration
18 May 2000
T000055-x0 Proposal for Upgrade of 40m Prototype - Large Seismic Stacks, and Bakeout Dennis Ugolini et al. Document Migration
18 May 2000
T000058-x0 Measurement of Seismic Motion at 40m and Transfer Function of Seismic Stacks Dennis Ugolini et al. Document Migration
18 May 2000
G000098-x0 Sept. 1999 40M Data Run Stuart Anderson et al. Document Migration
11 May 2000

Number of documents found: 28


DCC Version 3.5.0, contact DCC Help