Document List by Author

Larry Jones of LIGO - California Institute of Technology is listed as an author on the following documents:

LIGO-Number Title Author(s) Topic(s) Last Updated
T040111-v1 Galling Tendencies and Particles Produced by Ultra Clean Screw Threads Michael Gerfen et al. Basic R&D
System Engineering
07 Sep 2023
D010194-x0 Termination Bracket - 40M Larry Jones Document Migration
14 Oct 2021
P990007-v1 LIGO Beam Tube Module Design, Fabrication & Installation Lance Buboltz et al. Vacuum
Document Migration
02 Feb 2019
E1800032-v1 LIGO Beam Tube Qualification Test Procedures Larry Jones et al. Final Design
LIGO-India
Vacuum
12 Feb 2018
L950355-x0 Review of Beam Tube Specimen Contract Larry Jones Document Migration
18 Jan 2018
G970296-x0 Beam Tube fabrication and installation photos. Larry Jones Document Migration
27 Sep 2017
G970294-x0 Beam Tube fabrication and installation photos. Larry Jones Document Migration
27 Sep 2017
G970295-v1 A Collection of Photographs of the Beam Tube Installation at LHO, August 1997 Larry Jones Document Migration
Vacuum
07 Apr 2016
C962252-x0 Technical Direction Memorandum (TDM) 96-019 Larry Jones Document Migration
29 Sep 2014
E040023-x0 Linear Voice Coil Actuator Design Requirements Advanced LIGO Seismic Isolation System Dennis Coyne et al. Document Migration
31 Jul 2014
D961697-x0 Joint Layout Plan, Hanford and BTE Slab Sawcut Location Approval Larry Jones Document Migration
15 Jul 2014
D960047-x0 Hanford Beam Tube Details for Baffle Position Calculations Larry Jones Document Migration
09 Jul 2014
D020078-x0 ETMX Table Cover, 40M Lab Larry Jones Document Migration
07 May 2014
D000002-x0 Z Pivot Shim, Rev. A Larry Jones Document Migration
07 May 2014
D980241-x0 BSC Stool Larry Jones Document Migration
25 Apr 2014
D980240-x0 BSC Work Platform - Request for Price Larry Jones Document Migration
25 Apr 2014
D960051-x0 Beam Tube Gate Valve Soft Support Larry Jones Document Migration
03 Apr 2014
D960041-x0 BTE - Pump Cart Layout: Roughing Pump System Larry Jones Document Migration
03 Apr 2014
D950094-x0 Beam Tube Baffle Larry Jones Document Migration
02 Apr 2014
D950028-x0 Beam Tube Terminations Larry Jones Document Migration
02 Apr 2014
E010126-x0 Document Change Notice (DCN) Betsy Weaver et al. Document Migration
25 Mar 2014
E000008-x0 Document Change Notice (DCN) Larry Jones Document Migration
25 Mar 2014
E980133-x0 Document Change Notice (DCN) - New Release of a Drawing #D980246-A-D Larry Jones Document Migration
20 Mar 2014
E950105-x0 Beam Tube Termination Foundation: Loads Update Larry Jones Document Migration
20 Mar 2014
T940037-x0 CBI Vacuum Equipment Cleaning Procedure Larry Jones Document Migration
19 Mar 2014
G980087-x0 Summary of Drawing Review - HAM SEI FDR Larry Jones Document Migration
18 Mar 2014
G970287-x0 Beam Tube Technical Review Outline, 15 April 1997 Larry Jones Document Migration
17 Mar 2014
G970065-x0 Beam Tube Technical Review Outline Larry Jones Document Migration
14 Mar 2014
G960127-x0 Viewgraphs for Beam Tube from PC Meeting of 29 May 1996 Larry Jones Document Migration
13 Mar 2014
G950127-x0 Beam Tube - - LIGO Science Integration Meeting, 9 February 1995 Mike Gamble et al. Document Migration
13 Mar 2014
D950027-v1 Beam Tube Pump Port Hardware Larry Jones Document Migration
Vacuum
20 Sep 2013
G960015-x0 Beam Tube Alternate Bake Concepts Larry Jones Document Migration
08 May 2013
G950096-x0 Beam Tube Contract - Presentation to the NSF Larry Jones Document Migration
03 May 2013
G950093-x0 Beam Tube Source Selection Presentation Larry Jones Document Migration
03 May 2013
G950026-x0 Beam Tube Modules Presentation Larry Jones Document Migration
02 May 2013
G940038-x0 Beam Tube Modules - NSF Cost Review Presentation Larry Jones Document Migration
26 Apr 2013
C950496-x0 Beam Tube Modules Detailed Design - Master Document List Larry Jones Document Migration
25 Feb 2013
E010131-x0 Document Change Notice (DCN) Betsy Weaver et al. Document Migration
03 Jul 2012
E010129-x0 Document Change Notice (DCN) Betsy Weaver et al. Document Migration
03 Jul 2012
E000139-x0 Document Change Notice (DCN) Larry Jones Document Migration
28 Jun 2012
E000056-x0 Document Change Notice (DCN) Larry Jones Document Migration
28 Jun 2012
E000054-x0 Document Change Notice (DCN) Larry Jones Document Migration
28 Jun 2012
E000021-x0 Document Change Notice (DCN) Larry Jones Document Migration
28 Jun 2012
E000004-x0 Document Change Notice (DCN) Larry Jones Document Migration
28 Jun 2012
E990335-x0 Process Traveler Larry Jones Document Migration
28 Jun 2012
E980208-x0 Document Change Notice (DCN) Larry Jones Document Migration
19 Jun 2012
E980207-x0 Document Change Notice (DCN) Larry Jones Document Migration
19 Jun 2012
E980202-x0 Document Change Notice (DCN) Larry Jones Document Migration
19 Jun 2012
E970052-x0 Beam Tube Support Alignment Quality Check #2 Larry Jones Document Migration
14 Jun 2012
E960115-x0 Additional Beam Tube Contract Expenditures Larry Jones Document Migration
14 Jun 2012
E960105-x0 Beam Tube Alignment Larry Jones Document Migration
14 Jun 2012
E960091-x0 Quarterly Report: Beam Tube, 3/96-5/96 Larry Jones Document Migration
14 Jun 2012
E960041-x0 Beam Tube Contract Material Escalation Text Update Proposal. Larry Jones Document Migration
14 Jun 2012
E960019-x0 Request for Design Check: Valve Soft Support Larry Jones Document Migration
14 Jun 2012
E950116-x0 CBI`s Pump Port Positioning Accuracy Larry Jones Document Migration
12 Jun 2012
E950103-x0 Hanford Beam Tube Enclosure Construction Bid Package of 21 November 1995 Larry Jones Document Migration
12 Jun 2012
E950095-x0 Specification for 112 and 122 CM Gate Valves for LIGO Vacuum Equipment Richard Bagley et al. Document Migration
12 Jun 2012
E950015-x0 Beam Tube Module Specification (old Spec. #1100004, dated 5/17/94 - Rev. E) Larry Jones Document Migration
12 Jun 2012
E950013-x0 Process Specification for Low Hydrogen, Type 304L Stainless Steel Vacuum Products (old Spec. #1100007, dated 5/17/94 - Rev. A) Larry Jones Document Migration
12 Jun 2012
P990023-x0 LIGO Beam Tube Component and Module Leak Testing Warren Carpenter et al. Document Migration
27 Oct 2011
P000006-x0 Precision Alignment of the LIGO 4km Arms Using The Dual-Frequency Differential Global Positioning System (GPS), Rev. D Bill Althouse et al. Document Migration
27 Oct 2011
C961213-v1 Technical Direction Memorandum 15 to CBI: DI Water Specification Dennis Coyne Fabrication
Vacuum
23 Jul 2010
D030715-v1 Relevant Dimensions for Quad and SEI Installation at LASTI Dennis Coyne Installation
25 Jun 2010
D010120-v1 40-Meter Cable Clamp Derek Bridges Suspensions
Preliminary Design
04 Sep 2009
T980044-v1 Determination of Global and Local Coordinate Axes for the LIGO Sites Albert Lazzarini Integration
Installation
System Engineering
Vacuum
11 May 2009
D980712-x0 Termination Bracket Larry Jones Document Migration
06 Nov 2006
E030180-x0 Design Requirements for the In-Vacuum Mechanical Elements of the Advanced LIGO Seismic Isolation System for the HAM Chamber Dennis Coyne et al. Document Migration
25 Oct 2006
T030137-x0 ETM Controls Prototype: Mass Estimate of an ETM Suspension Layout Caroline Cantley et al. Document Migration
13 Apr 2006
G050187-x0 ADVANCED LIGO SUS ETM STRUCTURAL DESIGN SUMMARY - LSC Meeting, March 20-23, 2005, Livingston LA Caroline Cantley et al. Document Migration
07 Apr 2005
T030278-x0 Advanced LIGO SUS Preliminary Frequency Analysis of the Mode Cleaner Structure Mark Barton et al. Document Migration
07 Apr 2005
E050049-x0 Document Change Notice (DCN) - Electrical Feedthroughs for the BSC (Adv. LIGO) Larry Jones Document Migration
17 Feb 2005
D040481-x0 Quad Vacuum Chamber/Oven Larry Jones Document Migration
28 Sep 2004
E040392-x0 Quad Vacuum Chamber Design Requirements Larry Jones Document Migration
28 Sep 2004
E040393-x0 Quad Oven Design Requirements Larry Jones Document Migration
28 Sep 2004
E030179-x0 Design Requirements for the In-Vacuum Mechanical Elements of the Advanced LIGO Seismic Isolation System for the BSC Chamber Dennis Coyne et al. Document Migration
16 Jul 2004
E040212-x0 Document Change Notice (DCN) - Initial Release of D030100 (AdLIGO SEI BSC Optical Table & Structure Limits) Larry Jones Document Migration
07 May 2004
D030100-x0 ADVLIGO SEI BSC Optical Table & Structure Limits Larry Jones Document Migration
07 May 2004
E020537-x0 INSTALLATION SPECIFICATION - PEPI Installation Procedure (DRAFT) Larry Jones Document Migration
22 Dec 2003
G030429-x0 Adv LIGO and retrofit seismic isolation research update - LSC Meeting, August 18th - 21st, Hannover, Germany Rich Abbott et al. Document Migration
14 Oct 2003
E010122-x0 Document Change Notice (DCN) for LHO 4k ETMy Installation and Related Tasks ( E010001-B-W) Larry Jones et al. Document Migration
05 Sep 2003
T000044-x0 INSTALLATION SPECIFICATION - 2K IFO Alignment & COS Installation Completion Larry Jones Document Migration
23 May 2003
T000043-x0 INSTALLATION SPECIFICATION - HY Arm Cavity Baffle Installation & Fmy Magnet Retrieval Larry Jones Document Migration
23 May 2003
G030193-x0 Design Requirements - Advanced LIGO, Seismic Isolation System (SEI) Larry Jones Document Migration
09 May 2003
D020402-x0 Stand Assembly, Satellite Amplifier, 40M Lab Larry Jones Document Migration
23 Apr 2003
D010119-x0 O-Ring Fixture for 29.5" Port Larry Jones Document Migration
23 Apr 2003
D020221-x0 40M Tube Beam Tube C Larry Jones Document Migration
23 Apr 2003
D020411-x0 8 Cable Clamp Clip, Strain Relief, 10" Feedthrough Port, 40M Lab Larry Jones Document Migration
23 Apr 2003
D020171-x0 40M Mtg Collar Beam Tube A Larry Jones Document Migration
23 Apr 2003
D020222-x0 40M Tube Beam Tube B1 Larry Jones Document Migration
23 Apr 2003
D020079-x0 ETMY Table Cover, 40M Lab Larry Jones Document Migration
14 Feb 2003
D020419-x0 Stand Band, Satellite Amplifier Box Larry Jones Document Migration
14 Feb 2003
D020414-x0 3 Cable Cover, Strain Relief, 10" Feedthrough Port, 40M Lab Larry Jones Document Migration
14 Feb 2003
D020399-x0 Stand Plate, Satellite Amplifier Box, 40M Larry Jones Document Migration
14 Feb 2003
D020219-x0 40M Mounting Collar Beam Tube C Larry Jones Document Migration
14 Feb 2003
D020546-x0 EV Optics Tube, 40M Lab Larry Jones Document Migration
14 Feb 2003
D020174-x0 40M Tube Beam Tube A Larry Jones Document Migration
14 Feb 2003
D020413-x0 8 Cable Cover, Strain Relief, 10" Feedthrough Port, 40M Lab Larry Jones Document Migration
14 Feb 2003
D010204-x0 Cable Alignment Fixture Larry Jones Document Migration
14 Feb 2003
D020401-x0 Stand Insulator, Satellite Amplifier Box, 40M Lab Larry Jones Document Migration
14 Feb 2003
D010059-x0 Hardware for Camera Optics, 40 M Laboratory Larry Jones Document Migration
14 Feb 2003
D020077-x0 OPLEV Table Cover, 40M Lab Larry Jones Document Migration
14 Feb 2003
D020175-x0 40M BEAM TUBE A Larry Jones Document Migration
14 Feb 2003
D020398-x0 Assembly, Strain Relief, 10" Feedthrough Port, 40M Lab Larry Jones Document Migration
14 Feb 2003
D020395-x0 Opposite Clip, Strain Relief, 10" Feedthrough Port, 40M Lab Larry Jones Document Migration
14 Feb 2003
D020409-x0 8 Cable Opposite Clip, Strain Relief, 10" Feedthrough Port, 40M Lab Larry Jones Document Migration
14 Feb 2003
D010227-x0 Overhead BSC Crossbeam Bracket Larry Jones Document Migration
14 Feb 2003
D020220-x0 40M Mounting Collar Beam Tube B Larry Jones Document Migration
14 Feb 2003
D020173-x0 40M Top Plate Beam Tube A Larry Jones Document Migration
14 Feb 2003
D020216-x0 40M Flange Ring Beam Tube B Larry Jones Document Migration
14 Feb 2003
D020394-x0 Clamp Clip, Strain Relief, 10" Feedthrough Port, 40M Lab Larry Jones Document Migration
14 Feb 2003
D020229-x0 40M Tube Beam Tube B2 Larry Jones Document Migration
14 Feb 2003
D030008-x0 40M Vent Filter Bracket Larry Jones Document Migration
14 Feb 2003
D020172-x0 40M Window Cover Beam Tube A Larry Jones Document Migration
14 Feb 2003
D020410-x0 3 Cable Opposite Clip, Strain Relief, 10" Feedthrough Port, 40M Lab Larry Jones Document Migration
14 Feb 2003
D020412-x0 3 Cable Clamp Clip, Strain Relief, 10" Feedthrough Port, 40M Lab Larry Jones Document Migration
14 Feb 2003
D020227-x0 40M Trim Ring A Larry Jones Document Migration
14 Feb 2003
D020170-x0 40m Flange Ring Beam Tube A Larry Jones Document Migration
14 Feb 2003
D020397-x0 Cover, Strain Relief, 10" Feedthrough Port, 40M Lab Larry Jones Document Migration
14 Feb 2003
D020396-x0 Spacer, Strain Relief, 10" Feedthrough Port, 40M Lab Larry Jones Document Migration
14 Feb 2003
D020400-x0 Stand Clip, Satellite Amplifier Box, 40M Lab Larry Jones Document Migration
14 Feb 2003
D020218-x0 40M Top Plate Beam Tube B Larry Jones Document Migration
14 Feb 2003
D000260-x0 LIGO II SEI & SUS Installation Scenario Larry Jones Document Migration
13 Feb 2003
D020093-x0 Lids #2, Table Cover, 40M Lab Larry Jones Document Migration
13 Feb 2003
D020085-x0 Posts, Table Cover, 40M Lab Larry Jones Document Migration
13 Feb 2003
D020452-x0 Desiccant Cannister Body Larry Jones Document Migration
13 Feb 2003
D030019-x0 40M Chamber Door Holder Larry Jones Document Migration
13 Feb 2003
D020088-x0 Walls #2, Table Cover, 40M Lab Larry Jones Document Migration
13 Feb 2003
D000208-x0 Grout Plates for 40M Active Isolators Larry Jones Document Migration
13 Feb 2003
D020084-x0 Central Rails, Table Cover, 40M Lab Larry Jones Document Migration
13 Feb 2003
D020080-x0 ITMXY Table Cover Larry Jones Document Migration
13 Feb 2003
D020451-x0 Desiccant Cannister Cap Larry Jones Document Migration
13 Feb 2003
D020092-x0 Lids #1, Table Cover, 40M Lab Larry Jones Document Migration
13 Feb 2003
D020547-x0 EE, SE Optics Tubes Larry Jones Document Migration
13 Feb 2003
D020490-x0 Desiccant Cannister Bracket Larry Jones Document Migration
13 Feb 2003
D020545-x0 SV Optics Tube, 40M Lab Larry Jones Document Migration
13 Feb 2003
D000211-x0 Installation Fixtures & Procedures - 40 M Active Isolators Larry Jones Document Migration
13 Feb 2003
D020082-x0 Frame Rails #1, Table Cover, 40M Lab Larry Jones Document Migration
13 Feb 2003
D000259-x0 LIGO II SEI WRAP & PACKAGE PROPOSAL Larry Jones Document Migration
13 Feb 2003
D020083-x0 Frame Rails #2, Table Cover, 40M Lab Larry Jones Document Migration
13 Feb 2003
D020715-x0 Hinges Inline Illuminator, 40M Larry Jones Document Migration
13 Feb 2003
D020081-x0 SP&MC Table Cover, 40 M Larry Jones Document Migration
13 Feb 2003
D020099-x0 MTG COLLAR, INLINE ILLUMINATOR, 40M Larry Jones Document Migration
13 Feb 2003
D020304-x0 Parts, Viewport Mirror Mount Larry Jones Document Migration
13 Feb 2003
D020353-x0 40M Long Spool Fixture Frame Larry Jones Document Migration
13 Feb 2003
D020086-x0 Feet & Links, Table Cover, 40M Lab Larry Jones Document Migration
13 Feb 2003
D020098-x0 Inline Illuminator, 40M Larry Jones Document Migration
13 Feb 2003
D020280-x0 PEPI Retrofit Assembly Larry Jones Document Migration
13 Feb 2003
D020089-x0 Walls #3, Table Cover, 40M Lab Larry Jones Document Migration
13 Feb 2003
D020347-x0 35 Inch Flange Cover Larry Jones Document Migration
13 Feb 2003
D980238-x0 Table Clamp Components Larry Jones Document Migration
13 Feb 2003
D020102-x0 FLANGE RING, INLINE ILLUMINATOR,40M Larry Jones Document Migration
13 Feb 2003
D020090-x0 Walls #4, Table Cover, 40M Lab Larry Jones Document Migration
13 Feb 2003
D020087-x0 Walls #1, Table Cover, 40M Lab Larry Jones Document Migration
13 Feb 2003
D020100-x0 TOP PLATE, INLINE ILLUMINATOR, 40M Larry Jones Document Migration
13 Feb 2003
D000241-x0 LIGO II Stiff Active Seismic Isolation System Larry Jones Document Migration
13 Feb 2003
D020091-x0 Walls #5, Table Cover, 40M Lab Larry Jones Document Migration
13 Feb 2003
D020101-x0 WINDOW COVER, INLINE ILLUMINATOR, 40M Larry Jones Document Migration
13 Feb 2003
D000187-x0 Isolator Brackets for 40M Active Isolators Larry Jones Document Migration
13 Feb 2003
D980237-x0 Stack Clamp Components Larry Jones Document Migration
13 Feb 2003
D020685-x0 Camera Mirror Stand, 40M Lab Larry Jones Document Migration
29 Jan 2003
T920031-x0 Vacuum Equipment: Configuration Principles Larry Jones Document Migration
28 Oct 2002
T920033-x0 Isolation Stack Location Considerations: Test Mass Chamber, Type II and Diagonal Chamber Larry Jones Document Migration
28 Oct 2002
T920032-x0 Interferometer Access Considerations Larry Jones et al. Document Migration
28 Oct 2002
G930015-x0 Vacuum System: Description - NSF Review, 7-10 June 1993 Larry Jones Document Migration
14 Aug 2002
T010115-x0 Conceptual Design of the 40 meter Laboratory Upgrade for Prototyping a Advanced LIGO Interferometer Benjamin Abbott et al. Document Migration
26 Nov 2001
D010208-x0 Optical Port Retaining Flange Larry Jones Document Migration
25 Sep 2001
D010207-x0 Optical Port Seal Flange Larry Jones Document Migration
25 Sep 2001
D010193-x0 Clamp-On Holes, 40M Larry Jones Document Migration
07 Sep 2001
D010192-x0 CABLE CLAMPS "B", 40M Larry Jones Document Migration
07 Sep 2001
D010188-x0 Stand for 4` X 6` Table Larry Jones Document Migration
06 Sep 2001
D010190-x0 Leg for 5` x 12` Table Larry Jones Document Migration
06 Sep 2001
D010189-x0 Stand 3 for 3` X 4` Table Larry Jones Document Migration
06 Sep 2001
D010191-x0 Shim for Optical Tables Larry Jones Document Migration
06 Sep 2001
E010001-x0 Installation Specification - LHO Detector, Y-End Station, In-Chamber < > Installation Betsy Weaver et al. Document Migration
25 Jul 2001
D010106-x0 Stand for 3`x4`, 3`x5` Tables Larry Jones Document Migration
05 Jun 2001
D010108-x0 Leg for Low 3`x5` Table Larry Jones Document Migration
05 Jun 2001
D010107-x0 Stand for 2`x4` Table Larry Jones Document Migration
05 Jun 2001
D010057-x0 Tube Support Brackets, 40M Mode Cleaner Larry Jones Document Migration
15 May 2001
D010088-x0 8" ID Pressure Balanced Expansion Joint Larry Jones Document Migration
15 May 2001
T010028-x0 Performance of STACIS Seismic Isolation System at the 40 Meter Lab Larry Jones et al. Document Migration
13 Mar 2001
E000399-x0 INSTALLATION SPECIFICATION - LHO ETMx Installation and Related Tasks Larry Jones Document Migration
08 Mar 2001
D010046-x0 29.5" ID Adjustable Bellows Larry Jones Document Migration
07 Mar 2001
E000401-x0 Installation Specification - LHO 4K LVEA IFO Installation & Alignment Larry Jones Document Migration
11 Jan 2001
D000460-x0 Ported 29` Door: 40M Lab Larry Jones Document Migration
21 Dec 2000
D000349-x0 Adjustable 8" ID Bellows Larry Jones Document Migration
01 Dec 2000
D000361-x0 Bottom Plate, Stack Support, 18" Chamber Larry Jones Document Migration
03 Nov 2000
D000362-x0 Top Plate, Stack Support, 18" Chamber Larry Jones Document Migration
03 Nov 2000
D000359-x0 Support Beam, Stack Support, 18" Chamber Larry Jones Document Migration
03 Nov 2000
D000360-x0 1, Modified CF Flange. 2, Support Beam Weldment, Stack Support, 18" Chamber Larry Jones Document Migration
03 Nov 2000
D000363-x0 Assembly, Stack Support, 18" Chamber Larry Jones Document Migration
03 Nov 2000
E000384-x0 Process Traveler Larry Jones Document Migration
08 Aug 2000
E000335-x0 Document Change Notice (DCN) Larry Jones Document Migration
12 Jul 2000
E000306-x0 Chamber Component Configuration WBSC 6 Feb 29, 2000 Larry Jones Document Migration
11 Jul 2000
E000308-x0 Chamber Component Configuration WBSC 7 Apr 24, 2000 Larry Jones Document Migration
11 Jul 2000
E000307-x0 Chamber Component Configuration WBSC 6 Mar 1, 2000 Larry Jones Document Migration
11 Jul 2000
E000313-x0 Chamber Component Configuration WBSC 10 Mar 15, 2000 Larry Jones Document Migration
11 Jul 2000
E000309-x0 Chamber Component Configuration WBSC 7 May 12, 2000 Larry Jones Document Migration
11 Jul 2000
E000305-x0 Chamber Component Configuration WBSC 4 Apr 21, 2000 Larry Jones Document Migration
11 Jul 2000
E000310-x0 Chamber Component Configuration WBSC 8 May 10, 2000 Larry Jones Document Migration
11 Jul 2000
E000312-x0 Chamber Component Configuration WBSC 9 Apr 14, 2000 Larry Jones Document Migration
11 Jul 2000
E000311-x0 Chamber Component Configuration WBSC 8 May 12, 2000 Larry Jones Document Migration
11 Jul 2000
E000302-x0 Chamber Component Configuration WBSC 2 Feb 4, 2000 Larry Jones Document Migration
10 Jul 2000
E000301-x0 Chamber Component Configuration WBSC 1 Feb 16, 2000 Larry Jones Document Migration
10 Jul 2000
E000293-x0 Chamber Component Configuration WHAM 7 May 18, 2000 Larry Jones Document Migration
10 Jul 2000
E000304-x0 Chamber Component Configuration WBSC 3 Feb 9, 2000 Larry Jones Document Migration
10 Jul 2000
E000297-x0 Chamber Component Configuration WHAM 8 May 19, 2000 Larry Jones Document Migration
10 Jul 2000
E000296-x0 Chamber Component Configuration WHAM 8 May 18, 2000 Larry Jones Document Migration
10 Jul 2000
E000292-x0 Chamber Component Configuration WHAM 7 Apr 21, 2000 Larry Jones Document Migration
10 Jul 2000
E000298-x0 Chamber Component Configuration WHAM 9 May 18, 2000 Larry Jones Document Migration
10 Jul 2000
E000299-x0 Chamber Component Configuration WHAM 9 May 23, 2000 Larry Jones Document Migration
10 Jul 2000
E000303-x0 Chamber Component Configuration WBSC 2 Feb 9, 2000 Larry Jones Document Migration
10 Jul 2000
E000295-x0 Chamber Component Configuration WHAM 8 May 1, 2000 Larry Jones Document Migration
10 Jul 2000
E000300-x0 Chamber Component Configuration WHAM 10 May 19, 2000 Larry Jones Document Migration
10 Jul 2000
E000294-x0 Chamber Component Configuration WHAM 8 Apr 21, 2000 Larry Jones Document Migration
10 Jul 2000
D990554-x0 Support Plate Side Chamber Stack Assembly Larry Jones et al. Document Migration
09 May 2000
D990544-x0 Isolation Stack Assembly Side Chamber Larry Jones et al. Document Migration
09 May 2000
D990555-x0 Lower Beam Clamp Larry Jones et al. Document Migration
09 May 2000
D990613-x0 Upper Beam Clamp Larry Jones et al. Document Migration
27 Apr 2000
E000002-x0 Z Pivot Procedures Larry Jones Document Migration
14 Mar 2000
E000099-x0 Process Traveler: Fasteners Larry Jones Document Migration
01 Mar 2000
E000101-x0 Process Traveler: OSEM Cables Larry Jones Document Migration
01 Mar 2000
E000085-x0 Process Traveler Larry Jones Document Migration
01 Mar 2000
D000038-x0 Chamber Pier Configuration Larry Jones Document Migration
27 Jan 2000
D000039-x0 Z Pivot Assembly Larry Jones Document Migration
27 Jan 2000
D990540-x0 Bracket Larry Jones Document Migration
17 Jan 2000
D990539-x0 Bearing Plate, Rev. A Larry Jones Document Migration
17 Jan 2000
D990538-x0 Z Pivot Clamp for Air Bearing Larry Jones Document Migration
17 Jan 2000
T990098-x0 Beam Tube Information for Site Operations Larry Jones Document Migration
30 Nov 1999
E990347-x0 Process Traveler Larry Jones Document Migration
23 Sep 1999
E990264-x0 Process Traveler Larry Jones Document Migration
07 Sep 1999
E990212-x0 Process Traveler Larry Jones Document Migration
07 Sep 1999
E990037-x0 Process Traveler Larry Jones Document Migration
07 Sep 1999
E990201-x0 Process Traveler Larry Jones Document Migration
07 Sep 1999
E980205-x0 Process Traveler Larry Jones Document Migration
07 Sep 1999
E990248-x0 Process Traveler Larry Jones Document Migration
07 Sep 1999
E990204-x0 Process Traveler Larry Jones Document Migration
10 May 1999
E990162-x0 Process Traveler Larry Jones Document Migration
10 May 1999
E990163-x0 Process Traveler Larry Jones Document Migration
27 Apr 1999
E990011-x0 Process Traveler Larry Jones Document Migration
26 Apr 1999
E990117-x0 Process Traveler Larry Jones Document Migration
31 Mar 1999
E990146-x0 Document Change Notice (DCN) Dennis Coyne et al. Document Migration
26 Mar 1999
E980206-x0 Process Traveler: Liner - Long/Short, Flourel Larry Jones Document Migration
10 Nov 1998
E980203-x0 Process Traveler Larry Jones Document Migration
29 Oct 1998
E980204-x0 Process Traveler Larry Jones Document Migration
20 Oct 1998
D980235-x0 Ribbon Cable Clamp, Rev. B Larry Jones Document Migration
15 Sep 1998
T980047-x0 Rai`s Analysis of LAX Global Accumulation Data Larry Jones et al. Document Migration
27 May 1998
D980236-x0 Ribbon Cable Form for HAM Larry Jones Document Migration
20 May 1998
T970220-x0 Slab Joint Spacing - Worksheets Larry Jones Document Migration
15 Dec 1997
D950029-x0 General Details and Fixed Support Details Dennis Coyne et al. Document Migration
27 Aug 1997
T900026-x0 Corrugated Tube Test Report Larry Jones Document Migration
22 Jul 1997
E960098-x0 LIGO Detector Subsystem Review Report: Preliminary Design Review (PDR), Suspension System (SUS) Alex Abramovici et al. Document Migration
16 Jul 1997
T970111-x0 Data from Beam Tube Pump Down II Warren Carpenter et al. Document Migration
08 Jul 1997
T970131-x0 30-Minute Post Processed Point Location Graph, HNW350P Verification Larry Jones Document Migration
25 Jun 1997
T970107-x0 Tom Herring`s GPS Output Larry Jones Document Migration
01 May 1997
G970059-x0 TRB Meeting, 18 March 1997 - Baffle Shedding Investigations Larry Jones Document Migration
28 Apr 1997
T970105-x0 Rogers Measurements Larry Jones Document Migration
24 Apr 1997
T970104-x0 CBI Measurements Larry Jones Document Migration
24 Apr 1997
T960192-x0 Readings of Trimble Equipment Larry Jones Document Migration
10 Feb 1997
T970008-x0 Single Source Justification for Hydrocarbon Monitor (B&K 1302) Larry Jones Document Migration
03 Feb 1997
T960182-x0 Beam Tube Installation - Presentation for Science Integration Meeting, 12 December 1996 Larry Jones Document Migration
17 Dec 1996
T960133-x0 Spiral Weld Outgassing Larry Jones Document Migration
06 Aug 1996
T960123-x0 Spiral Weld Outgas Measurements Larry Jones Document Migration
25 Jul 1996
T960100-x0 Beam Tube Enclosure (BTE) - Pump Cart Layout: New Roughing Pump System Larry Jones Document Migration
17 Jun 1996
T960021-x0 Beam Tube Alignment Concept Meeting, 20 February 1996 Larry Jones Document Migration
24 May 1996
E960040-x0 Document Change Notice (DCN) Larry Jones Document Migration
25 Apr 1996
E960039-x0 Document Change Notice (DCN) Larry Jones Document Migration
25 Apr 1996
D960033-x0 LIGO Beam Tube QT Module Items Shipped to Caltech Larry Jones Document Migration
20 Feb 1996
T950039-x0 Air Signature Leak Locating Point Larry Jones Document Migration
28 Jun 1995
T950042-x0 Service Road Dimensions Larry Jones Document Migration
31 May 1995
E950020-x0 LIGO Beam Tube Module Requirements Larry Jones Document Migration
22 May 1995
E950016-x0 Service Road Width Larry Jones Document Migration
11 May 1995
T950026-x0 Metal seals to replace O-rings Larry Jones Document Migration
24 Apr 1995
T950016-x0 R. Weiss` latest plots Larry Jones Document Migration
20 Feb 1995
T950014-x0 R. Weiss` comments/recommended revisions to the QT procedure Larry Jones Document Migration
03 Jan 1995
T940060-x0 Comments on QT Pumpdown, Bake Out and Outgassing Test Procedure, Rev. 3 Larry Jones Document Migration
22 Dec 1994
T940049-x0 QT FTIR data - FTIR Measurements of Solvent Drainage Larry Jones Document Migration
19 Dec 1994
T940044-x0 Recommended changes for positioning thermocouples on the QT module Larry Jones Document Migration
12 Dec 1994
T940042-x0 Notes on the QT items tested vs. items by analysis Larry Jones Document Migration
09 Dec 1994
T940040-x0 Transmittal of LIGO-T940041-00-B Larry Jones Document Migration
28 Nov 1994
T940038-x0 Information on isopropyl alcohol from the Aldrich Chemical and Fisher Scientific Catalogs Larry Jones Document Migration
18 Nov 1994
T940059-x0 ASTM Atomizer and Water Break tests Larry Jones Document Migration
15 Nov 1994
T940034-x0 Water break test Larry Jones Document Migration
10 Nov 1994
T940031-x0 Near term procedure to modify and test beam tube cleaning Larry Jones Document Migration
05 Nov 1994
T940058-x0 R. Weiss` input on morning meeting on beam tube cleaning Larry Jones Document Migration
04 Nov 1994
T940057-x0 R. Weiss` surface tension measurements Larry Jones Document Migration
03 Nov 1994
T940029-x0 FTIR analysis from beam tube bleeders Larry Jones Document Migration
02 Nov 1994
T940056-x0 R. Weiss` Summary of information and recommendations on the beam tube cleaning following visit and further research Larry Jones Document Migration
02 Nov 1994
T940028-x0 Hydrocarbon peaks in the weeper data Larry Jones Document Migration
01 Nov 1994
T940027-x0 Steps for Beam Tube Cleaning Larry Jones Document Migration
25 Oct 1994
T940026-x0 Beam Tube Sequence of Events, Occurance of Bleeders Larry Jones Document Migration
21 Oct 1994
T940023-x0 Disagreement on acceptable leakage Larry Jones Document Migration
06 Oct 1994
T940055-x0 R. Weiss` comments on allowable vacuum box leaks/pressure achieved Larry Jones Document Migration
13 Sep 1994
T940052-x0 Transmittal of LIGO-T94-0051-00B Larry Jones Document Migration
08 Aug 1994
T940053-x0 Plot of measurements made of 60` spiral QT tube straightness and diameter in second plane Larry Jones Document Migration
01 Aug 1994
T940009-x0 Comments on hot procedures Larry Jones Document Migration
08 Jun 1994
T940010-x0 Comments on MetalPro operations list Larry Jones Document Migration
03 Jun 1994
T940011-x0 Sketches and information for slab and enclosure discussion Larry Jones Document Migration
08 Mar 1994
T940012-x0 Sketch of how Caltech is planning to conduct the module bakeout Larry Jones Document Migration
02 Feb 1994
T940007-x0 AMU values and document on strategy entitled "Vacuum System Model Gas Solutions and RGA Spectra" Larry Jones Document Migration
25 Jan 1994
T940018-x0 Comments to CBI letter on alternate cleaning evaluation Larry Jones Document Migration
25 Jan 1994
T940008-x0 R. Weiss` plots of coil temperatures Larry Jones Document Migration
21 Jan 1994
T940013-x0 Response to request to the data format used in Beam Tube Demo Testing Larry Jones Document Migration
03 Jan 1994
T930011-x0 Suggested guidelines for wrapping and shipping Larry Jones Document Migration
14 Dec 1993
T930012-x0 Authorization to proceed with task of preparing coupons to measure filler wire effects on outgassing Larry Jones Document Migration
13 Dec 1993
T930003-x0 Notes from Boude on conductance calculations showing improvements from the normal electric analog method Larry Jones Document Migration
10 Dec 1993
T930005-x0 Article on Brookhaven 950 C vacuum bake entitled "Outgassing and desorption of the stainless-steel beam tubes after different Larry Jones Document Migration
19 Nov 1993
T930006-x0 Article entitled "Construction and commissioning of the alternating-gradient synchrotron booster ultrahigh vacuum system Larry Jones Document Migration
18 Nov 1993
T930008-x0 Suggested Qualification Test and Coupon Test P&I schematic modifications Larry Jones Document Migration
03 Nov 1993
T930009-x0 Carbide precipitation curve Larry Jones Document Migration
29 Oct 1993

Number of documents found: 309


DCC Version 3.5.0, contact DCC Help