Document List by Author

New Code Deployment on DCC.

A new version of DCC code was just deployed. Our team is currently checking that nothing unexpected happened in the process.

This message will be removed shortly.

In the meantime please use the following read-only replicas:

Status message last updated at: Sun May 11 06:27:23 PDT 2025

Srinath Karat of LIGO - California Institute of Technology is listed as an author on the following documents:

LIGO-Number Title Author(s) Topic(s) Last Updated
D1002884-v8 Flange Layout - L1 Horizontal Access Module1 (HAM 1) Emery Brown et al. Preliminary Design
System Engineering
24 Mar 2025
D1002890-v8 Flange Layout – L1 Horizontal Access Module 6 (HAM 6) Emery Brown et al. Preliminary Design
System Engineering
16 Dec 2015
D1002877-v15 Flange Layout - H1 Horizontal Access Module 6 (HAM 6) v15 is the O5 configuration. Emery Brown et al. System Engineering
Preliminary Design
Installation
Integration
10 Sep 2024
T2300255-v1 Modal Analyses of Opto-Mechanical Mounts for IO PSL Periscope. Kaitlyn Gomez et al. Input Optics
Basic R&D
System Engineering
08 Mar 2024
D1101085-v4 aLIGO TCS HWS OPTICS ASSEMBLY, H1 HAM4 Aidan Brooks et al. Vacuum
Auxiliary Optics
Final Design
16 Jul 2014
D1101083-v2 aLIGO TCS HWS in-vacuum Opto Mechanical Layout, ITMX, H1, Assembly Aidan Brooks et al. Final Design
Auxiliary Optics
Vacuum
29 Jul 2014
D1101847-v5 aLIGO TCS HWS OPTO MECHANICAL LAYOUT, ITMX, L1 Aidan Brooks et al. Vacuum
Fabrication
Preliminary Design
System Engineering
Integration
Final Design
Auxiliary Optics
23 Oct 2019
D1101846-v1 aLIGO TCS HWS Optics Assembly In Vacuum, L1 HAM4 Aidan Brooks et al. Auxiliary Optics
Final Design
Integration
Preliminary Design
System Engineering
Vacuum
Fabrication
24 May 2012
D1101848-v1 aLIGO TCS HWS OPTO MECHANICAL LAYOUT, ITMY, L1 Aidan Brooks et al. System Engineering
Preliminary Design
Fabrication
Vacuum
Auxiliary Optics
Final Design
Integration
03 May 2012
D1400220-v1 aLIGO, SUS, HSTS, MIDDLE MASS BLADE Harrison Miller et al. Fabrication
27 Apr 2015
E0900237-v5 Acceptable Machining Fluids for UHV parts Michael Meyer Fabrication
03 Feb 2011
D0900295-v8 aLIGO OMCS Overall Assembly Derek Bridges Final Design
Suspensions
02 Oct 2019
D1101855-v3 aLIGO SUS L1 H1 HAM4 HSTS PRE INSTALLATION PLATE Sam Barnum et al. Installation
Final Design
Input Optics
18 Sep 2013
D2200025-v1 A+, OFI, LENS CAP Eduardo Sanchez et al. Fabrication
A+
28 Mar 2022
D1900116-v9 A+, HAM7, Flange Layout – H1 Horizontal Access Module 7 Eduardo Sanchez Preliminary Design
System Engineering
A+
04 Aug 2021
D0900124-v1 aLIGO, SEI, HAM ISI Table Assembly Andy Stein et al. Seismic Isolation
Final Design
07 Mar 2022
D071104-v2 Flexure Cup Andy Stein et al. Final Design
Seismic Isolation
04 Feb 2022
D071102-v2 Flexure Andy Stein et al. Final Design
Seismic Isolation
04 Feb 2022
D071105-v2 Flexure Lower Plate Andy Stein et al. Final Design
Seismic Isolation
04 Feb 2022
D071103-v2 Flexure Mount Andy Stein et al. Seismic Isolation
Final Design
04 Feb 2022
D071100-v3 Spring Andy Stein et al. Final Design
Seismic Isolation
03 Feb 2022
D1300077-v3 AdvLIGO SUS HAM6-L1, XYZ Local CS for Output Mode Cleaner Suspension (OMC) Jose Eduardo Chavez Final Design
System Engineering
24 Jul 2015
Q2000005-v1 TMS shroud Post-coating Inspection Kyle Baric et al. Incoming Inspection
30 Nov 2021

Number of documents found: 23


DCC Version 3.5.1, contact DCC Help