LIGO-E1300925-v2
06 Mar 2015, 16:18 |
Here is a list of the tests that still need to be done:
- 1.1 Load Cell Assembly: the value will be recorded in this document
- 1.4 Check Stops Gaps: this test will be done when we unlock HEPI on L1 HAM 4
- 1.6 IPS Centering
- 1.9 Static Test Local Drive
- 1.14 Alignment Offsets
DCC Version 3.5.2, contact
DCC Help