Document List by Author
Home
Recent Changes
Topics
Login
Margot Hennig
of Maastricht University
is listed as an author on the following documents:
LIGO-Number
Title
Author(s)
Topic(s)
Last Updated
G1100283-v1
Effect of Heat Treatment on the Optical Absorption of Dielectric Coatings: effect of temperature and Oxygen pressure
Ashot Markosyan
et al.
Core Optics
02 Oct 2024
E1000863-v1
QA Test Procedure for aLIGO COC Reflection Transmission Scatter and Absorption
Liyuan Zhang
et al.
Subsystem Test
Core Optics
16 Sep 2024
E1200484-x0
aLIGO, COC
GariLynn Billingsley
et al.
Core Optics
06 Jul 2023
E1201035-v25
aLIGO Chamber Entry & Exit Procedures
Calum Torrie
et al.
System Engineering
Safety
27 Mar 2023
E1300312-v4
ETM08 HR Coating Absorption
Liyuan Zhang
et al.
Core Optics
Subsystem Test
21 Mar 2023
E1300313-v2
ETM08 Transmission
Liyuan Zhang
et al.
Core Optics
Subsystem Test
03 Mar 2023
E1300555-v3
ETM12 Integrated Scatter
Liyuan Zhang
et al.
Subsystem Test
Core Optics
03 Feb 2023
E1300311-v3
ETM08 Integrated Scatter
Liyuan Zhang
et al.
Subsystem Test
Core Optics
02 Feb 2023
E1300674-v2
ITM09 HR AR Absorption
Liyuan Zhang
et al.
Core Optics
Subsystem Test
13 Jan 2023
E1300556-v1
ETM12 HR Coating Absorption
Liyuan Zhang
et al.
Core Optics
Subsystem Test
09 Mar 2022
E0900394-v6
aLIGO optic container shipping and storage procedure
GariLynn Billingsley
et al.
Core Optics
20 Sep 2022
E1300557-v1
ETM12 Transmission
Liyuan Zhang
et al.
Subsystem Test
Core Optics
09 Mar 2022
E1300314-v1
ETM08 AR Reflection
Liyuan Zhang
et al.
Subsystem Test
Core Optics
16 Oct 2015
E1300558-v1
ETM12 AR Reflection
Liyuan Zhang
et al.
Core Optics
Subsystem Test
09 Mar 2022
E1100439-v7
General Optics Cleaning Procedure
Margot Hennig
Input Optics
Auxiliary Optics
Core Optics
System Engineering
Cleaning
29 Apr 2022
E1400041-v1
ITM11 Integrated Scatter
Liyuan Zhang
et al.
Core Optics
Subsystem Test
10 Nov 2021
E1400042-v1
ITM11 Transmission
Liyuan Zhang
et al.
Subsystem Test
Core Optics
10 Nov 2021
E1400043-v1
ITM11 AR Reflection
Liyuan Zhang
et al.
Subsystem Test
Core Optics
10 Nov 2021
T1400035-v1
ITM11 Inspection Report
Margot Hennig
Core Optics
10 Nov 2021
E1300017-v8
First Contact Spray Application & Removal Procedure
Calum Torrie
et al.
System Engineering
12 Aug 2021
T1300493-v1
"Known" Particulate Sample Poster
Kaitlin Gushwa
et al.
System Engineering
11 Feb 2021
E1200266-v2
Ground Glass Freon Wipe Cleaning Procedure
Margot Hennig
et al.
Input Optics
Auxiliary Optics
Core Optics
Cleaning
20 Feb 2013
T1000456-v1
Bulk absorption measurement of the CP01 substrate, Heraeus suprasil 3001
Rand Dannenberg
et al.
Core Optics
24 Apr 2020
E1300330-v1
ETM09 Integrated Scatter
Liyuan Zhang
et al.
Core Optics
Subsystem Test
16 Oct 2015
E1400010-v2
ITM03 HR AR Absorption
Liyuan Zhang
et al.
Subsystem Test
Core Optics
27 Feb 2019
E1000079-v9
First Contact Brush and Pour Application Procedure
Margot Hennig
et al.
Core Optics
System Engineering
19 Dec 2018
E1300673-v2
ITM09 AR Reflection
Liyuan Zhang
et al.
Core Optics
Subsystem Test
14 Jun 2018
E1300672-v3
ITM09 Transmission
Liyuan Zhang
et al.
Core Optics
Subsystem Test
14 Jun 2018
E1200702-v1
ITM04 Transmission
Liyuan Zhang
et al.
System Test
Core Optics
12 Jun 2018
E1200704-v1
ITM04 HR AR Absorption
Liyuan Zhang
et al.
Subsystem Test
Core Optics
12 Jun 2018
E1200703-v1
ITM04 AR Reflection
Liyuan Zhang
et al.
Core Optics
Subsystem Test
12 Jun 2018
E1200701-v1
ITM04 Integrated Scatter
Liyuan Zhang
et al.
Subsystem Test
Core Optics
12 Jun 2018
E1400009-v1
ITM03 AR Reflection
Liyuan Zhang
et al.
Core Optics
Subsystem Test
12 Jun 2018
E1400008-v1
ITM03 Transmission
Liyuan Zhang
et al.
Subsystem Test
Core Optics
12 Jun 2018
E1200575-v2
ITM08 Transmission
Liyuan Zhang
et al.
Core Optics
Subsystem Test
12 Jun 2018
E1200577-v2
ITM08 HR AR Absorption
Liyuan Zhang
et al.
Subsystem Test
Core Optics
12 Jun 2018
E1200576-v2
ITM08 AR Reflection
Liyuan Zhang
et al.
Subsystem Test
Core Optics
12 Jun 2018
E1200574-v2
ITM08 Integrated Scatter
Liyuan Zhang
et al.
Subsystem Test
Core Optics
12 Jun 2018
G1800845-v1
Cryogenic suspensions for future gravitational wave detectors
Marielle van Veggel
et al.
Conceptual Design
Suspensions
Basic R&D
16 May 2018
E1000278-v7
Preparation of an end or input test mass (ETM/ITM) (Hydroxide-Catalysis Bonding of ears)
Margot Hennig
et al.
Suspensions
Final Design
28 Aug 2012
T1000534-v4
COC Ergo-Arm Procedure for lifting large optics
Margot Hennig
Core Optics
22 Mar 2018
G1000351-v3
First Contact: Practical Engineering Solutions
Margot Hennig
Meeting
Core Optics
17 Jan 2017
G1601138-v1
Indium bond research for crystalline cryogenic suspensions
Margot Hennig
Meeting
30 Nov 2016
D0900949-v2
End Reaction Mass ESD Coating Face Pattern
Margot Hennig
Final Design
Procurements
Core Optics
06 Jul 2016
G1601114-x0
GW150914 a quadruple whammy
Angus Bell
et al.
Public Talk / Colloquium
16 May 2016
E1000752-v5
Preparation of a thermal compensation plate (TCP) or end reaction mass (ERM) (Gluing wire break-off prisms and earthquake stops)
Margot Hennig
et al.
Suspensions
Installation
08 Mar 2016
E1300329-v1
ETM09 Transmission
Liyuan Zhang
et al.
Core Optics
Subsystem Test
16 Oct 2015
E1300332-v1
ETM09 AR Reflection
Liyuan Zhang
et al.
Subsystem Test
Core Optics
16 Oct 2015
E0900113-v3
Compensation Plate Electro Static Drive gold coating specification
GariLynn Billingsley
Core Optics
Final Design
02 Sep 2015
E0900112-v3
Compensation Plate Barrel gold coating specification
GariLynn Billingsley
Core Optics
Final Design
02 Sep 2015
L1100162-v1
VRB question: acceptable to not vacuum bake the CP and ERM to ESD flex connector bond?
Dennis Coyne
et al.
Core Optics
Vacuum
Suspensions
11 Mar 2015
D1002747-v1
ERM/CP/ITM/ETM Optic Ergo-arm vacuum plate
Margot Hennig
Core Optics
03 Feb 2015
D1002746-v1
FM Optic Ergo-arm vacuum plate
Margot Hennig
Core Optics
03 Feb 2015
G1000095-v1
Feb 2010 Upgraded LASTI Ergo-arm videos
Margot Hennig
et al.
System Engineering
03 Feb 2015
G1400209-v2
Laser Induced Damage due to Particulate Contamination
GariLynn Billingsley
et al.
Basic R&D
Core Optics
08 Sep 2014
E1200326-v2
First Contact cleaning of water spots or water soluble contamination
GariLynn Billingsley
et al.
Core Optics
Cleaning
04 Sep 2014
T1000137-v3
Drag Wiping and First Contact
Margot Hennig
et al.
Core Optics
27 Aug 2014
E1000128-v1
FTIR: First Contact with PEEK mesh
Margot Hennig
Core Optics
19 Aug 2014
P1300192-v2
Optical contamination control in the Advanced LIGO ultra-high vacuum system
Margot Hennig
et al.
System Engineering
Core Optics
11 Mar 2014
T1300093-v7
Prudential Body Box Results
Kaitlin Gushwa
et al.
Basic R&D
System Engineering
01 Nov 2013
E1000277-v13
Preparation of an end or input penultimate mass (ETM-PM/ITM-PM) (Hydroxide-Catalysis Bonding of ears and gluing prisms and magnet flags)
Marielle van Veggel
et al.
Final Design
Suspensions
25 Jul 2013
E0900140-v3
Advanced LIGO End Reaction Mass Coating Specification
Margot Hennig
Core Optics
Final Design
04 Jul 2013
T1300533-v1
AR Coating Etching Tests
Margot Hennig
et al.
Core Optics
13 Jun 2013
E1200544-v2
CP08 S1 Absorption
Margot Hennig
et al.
Core Optics
11 Jan 2013
G1200960-v1
Adventures in AR Absorption with aLIGO Core Optics
Margot Hennig
Core Optics
09 Sep 2012
E1200515-v1
45 Deg. Reflection of IMCF05 IMCF06 IMCF07 IMCF08 IMCF09
Margot Hennig
et al.
Input Optics
Core Optics
17 May 2012
E1200514-v1
45 deg. Transmission of IMCF05 IMCF06 IMCF07 IMCF08 IMCF09
Margot Hennig
et al.
Input Optics
Core Optics
17 May 2012
E1200429-v1
PR203 HR Transmission Data
Margot Hennig
et al.
Core Optics
Input Optics
30 Apr 2012
E1200430-v1
PR203 HR Absorption Data
Margot Hennig
et al.
Core Optics
Input Optics
30 Apr 2012
T1100286-v2
Methanol Spray Optic Cleaning Procedure
Margot Hennig
Auxiliary Optics
Input Optics
Cleaning
17 Apr 2012
E000007-v4
Liquinox Cleaning Procedure
Helena Armandula
et al.
Document Migration
Input Optics
Auxiliary Optics
Core Optics
05 Mar 2012
T1000105-v5
Cleaning Procedures for Viton and PFA encapsulated Viton O-rings
Margot Hennig
Core Optics
20 Oct 2011
T1100238-v2
Report on hydroxide catalysis bonding done at LHO in March and April 2011
Marielle van Veggel
et al.
Suspensions
Installation
Core Optics
02 Aug 2011
D1003103-v2
OPTIC GALLOWS PEEK SPACER
Norris Kilpatrick
et al.
Fabrication
Core Optics
28 Jul 2011
E080516-v3
E080516_Advanced LIGO PR3 Polishing Specification
Margot Hennig
Final Design
Core Optics
14 Sep 2010
T1000434-v1
Advantages of cleaning optics with Red First Contact
Margot Hennig
Core Optics
27 Jul 2010
T1000006-v6
Notes on Making Electrical Connections to Metalized Crystals & Test Outline for ESD Samples
Margot Hennig
et al.
Suspensions
23 Mar 2010
T1000108-v2
Sucker plate o-ring tests
Margot Hennig
Core Optics
08 Mar 2010
E080517-v3
E080517 F-PR3 Polishing Specification
Margot Hennig
Final Design
Core Optics
05 Aug 2009
E080518-v3
E080518_SR3_Spec
Margot Hennig
Core Optics
Final Design
05 Aug 2009
Number of documents found: 80
Home
Recent Changes
Topics
Login
DCC
Version 3.5.0
, contact
DCC Help