LIGO-Number |
Title |
Author(s) |
Topic(s) |
Last Updated |
G1200916-v1 |
Suspension systems for the AEI 10 m prototype |
Alan Cumming et al. |
Preliminary Design
Suspensions
|
05 Nov 2024 |
D080751-v4 |
Advanced LIGO, Suspension, ETM/ITM Test Mass, Production ear |
Marielle van Veggel |
Suspensions
Final Design
|
28 Sep 2023 |
T0900447-v4 |
Final Design Document ETM/ITM Ears |
Marielle van Veggel |
Fabrication
Suspensions
|
24 Feb 2014 |
E1000828-v2 |
Prism bonding jig settings calculation sheet for the ERM and TCP |
Marielle van Veggel |
Suspensions
Installation
|
13 Sep 2011 |
T1100438-v1 |
Report on fiducial line position measurements for ETM04 |
Gerardo Moreno et al. |
Core Optics
Installation
Suspensions
|
01 Jul 2020 |
T1100404-v4 |
Note to support corrected jig settings-calculations for off-set fiducial lines of ETM04 |
Marielle van Veggel et al. |
Suspensions
Installation
|
01 Jul 2020 |
G1800845-v1 |
Cryogenic suspensions for future gravitational wave detectors |
Marielle van Veggel et al. |
Basic R&D
Conceptual Design
Suspensions
|
16 May 2018 |
E1000278-v7 |
Preparation of an end or input test mass (ETM/ITM) (Hydroxide-Catalysis Bonding of ears) |
Margot Hennig et al. |
Final Design
Suspensions
|
28 Aug 2012 |
T1000017-v1 |
Monolithic Test Hang Procedure Notes |
Matthew Maxwell et al. |
Subsystem Test
Suspensions
|
12 Apr 2017 |
G1601661-v2 |
Some optical properties of hydroxide catalysis bonds |
Marielle van Veggel et al. |
Meeting
|
29 Aug 2016 |
G1601717-v1 |
Non-destructive bond thickness and refractive index values from measurements of the optical reflectivity of hydroxide-catalysis bonds |
Valentina Mangano et al. |
Meeting
Core Optics
|
28 Aug 2016 |
D1000759-v3 |
Advanced LIGO SUS ETM Production Monolithic Assembly |
Russell Jones et al. |
Final Design
Assembly
Suspensions
|
12 Jul 2016 |
D090007-v4 |
Advanced LIGO, Suspension, ETM/ITM Quad PM, Production Ear with Recess |
Marielle van Veggel |
Suspensions
Final Design
|
14 Apr 2016 |
E1000752-v5 |
Preparation of a thermal compensation plate (TCP) or end reaction mass (ERM) (Gluing wire break-off prisms and earthquake stops) |
Margot Hennig et al. |
Installation
Suspensions
|
08 Mar 2016 |
G1501438-v1 |
Status of hydroxide catalysis and indium bonding research for use in cryogenic mirror suspensions in KAGRA, ET and upgrades to aLIGO |
Marielle van Veggel |
Meeting
|
02 Dec 2015 |
G1500638-v1 |
Current status of bonding research for sapphire and silicon suspensions |
Marielle van Veggel |
Meeting
|
19 May 2015 |
G1500637-v1 |
Current status of bonding research for sapphire and silicon suspensions |
Marielle van Veggel |
Meeting
|
18 May 2015 |
T1500177-v1 |
Inspect PUM Ears D090007 Serial number 0128 |
GariLynn Billingsley et al. |
Suspensions
|
17 Apr 2015 |
G1400857-v1 |
Studies of some properties of hydroxide-catalysis bonds |
Valentina Mangano et al. |
Meeting
|
24 Aug 2014 |
D0901592-v2 |
ASSEMBLY DRAWING - ear bonding jig |
Marielle van Veggel |
Preliminary Design
Suspensions
|
16 Jun 2014 |
G1400524-v1 |
Advances in bonding for the construction of mirror suspensions of future generation gravitational wave detectors |
Marielle van Veggel |
Basic R&D
|
26 May 2014 |
D0902505-v9 |
Fiber Guard Assembly (Installation Instructions) |
Marielle van Veggel et al. |
Preliminary Design
Suspensions
|
02 Apr 2014 |
D0902513-v4 |
Fibre guard angle section 5 |
Marielle van Veggel et al. |
Preliminary Design
Suspensions
|
12 Feb 2014 |
D0902511-v4 |
Fibre guard angle section 3 |
Marielle van Veggel et al. |
Suspensions
Preliminary Design
|
12 Feb 2014 |
D1002147-v1 |
aLIGO BS/FM Prism bonding jig |
Marielle van Veggel et al. |
Installation
Suspensions
|
11 Dec 2013 |
D1002153-v3 |
aLIGO BS/FM Prism holder |
Marielle van Veggel et al. |
Installation
Suspensions
|
11 Dec 2013 |
D1002149-v1 |
aLIGO BS/FM Prism bonding baseplate |
Marielle van Veggel et al. |
Installation
Suspensions
|
11 Nov 2013 |
D1002151-v3 |
aLIGO BS/FM Prism bonding support cylinder |
Marielle van Veggel et al. |
Installation
Suspensions
|
11 Nov 2013 |
E1000277-v13 |
Preparation of an end or input penultimate mass (ETM-PM/ITM-PM) (Hydroxide-Catalysis Bonding of ears and gluing prisms and magnet flags) |
Marielle van Veggel et al. |
Final Design
Suspensions
|
25 Jul 2013 |
D1000128-v3 |
Penultimate mass prism holder for D0901592 bonding jig |
Marielle van Veggel et al. |
Preliminary Design
Suspensions
|
18 Jul 2013 |
D1001623-v2 |
aLIGO ETM/ITM penultimate mass prism holder assembly |
Marielle van Veggel et al. |
Suspensions
Installation
|
18 Jul 2013 |
E050228-v2 |
Silicate Bonding Procedure (Hydroxide-Catalysis Bonding) |
Marielle van Veggel |
Basic R&D
Suspensions
|
31 Aug 2010 |
E1000829-v6 |
BS/FM Prism Gluing Jig Settings Calculation Spreadsheet |
Marielle van Veggel et al. |
Installation
Suspensions
|
16 Jan 2013 |
T0900369-v1 |
Removal of the ears and prisms at LASTI in July 2009 |
Liam Cunningham et al. |
Suspensions
Installation
|
17 Sep 2012 |
D0902507-v6 |
Fibre guard Main Body |
Marielle van Veggel et al. |
Suspensions
Final Design
|
13 Feb 2012 |
D0902519-v4 |
aLIGO SUS, Fibre guard angle section 11 |
Marielle van Veggel et al. |
Final Design
Suspensions
|
13 Feb 2012 |
D0902518-v4 |
aLIGO SUS, Fibre guard angle section 10 |
Marielle van Veggel et al. |
Suspensions
Final Design
|
13 Feb 2012 |
D0902517-v4 |
aLIGO SUS,Fibre guard angle section 9 |
Marielle van Veggel et al. |
Suspensions
Final Design
|
13 Feb 2012 |
D0902508-v5 |
aLIGO SUSFibre guard Separator |
Marielle van Veggel et al. |
Final Design
Suspensions
|
13 Feb 2012 |
D0902516-v4 |
aLIGO SUS,Fibre guard angle section 8 |
Marielle van Veggel et al. |
Suspensions
Final Design
|
13 Feb 2012 |
D0902515-v3 |
Fibre guard angle section 7 |
Marielle van Veggel et al. |
Preliminary Design
Suspensions
|
09 Feb 2012 |
D0902514-v3 |
Fibre guard angle section 6 |
Marielle van Veggel et al. |
Suspensions
Preliminary Design
|
09 Feb 2012 |
D0902512-v6 |
Fibre guard angle section 4 |
Marielle van Veggel et al. |
Suspensions
Preliminary Design
|
09 Feb 2012 |
D0902510-v3 |
Fibre guard angle section 2 |
Marielle van Veggel et al. |
Preliminary Design
Suspensions
|
09 Feb 2012 |
D0902509-v3 |
Fibre guard angle section 1 |
Marielle van Veggel et al. |
Preliminary Design
Suspensions
|
09 Feb 2012 |
D0902506-v9 |
Fibre guard assembly |
Marielle van Veggel et al. |
Suspensions
Preliminary Design
|
09 Feb 2012 |
T1000345-v2 |
The Design of the IGR MKII Strength Testing Machine |
Russell Jones et al. |
Suspensions
Basic R&D
|
11 Oct 2011 |
D0900957-v1 |
ALIGO SUS ETM/ITM monolithic assembly - spring clamp for weld mirror on weld hub |
Giles Hammond et al. |
Preliminary Design
|
09 Sep 2011 |
T1100238-v2 |
Report on hydroxide catalysis bonding done at LHO in March and April 2011 |
Marielle van Veggel et al. |
Core Optics
Installation
Suspensions
|
02 Aug 2011 |
T1100081-v1 |
Shear strength testing of hydroxide catalysis bonded discs |
Marielle van Veggel et al. |
Basic R&D
|
22 Jun 2011 |
G0900791-v1 |
Flame welding tests for monolithic suspension of a 40-kg test mass (as backup for Advanced LIGO) |
Giles Hammond et al. |
Suspensions
|
17 May 2011 |
D1100555-v1 |
Metrology baseplate for ear and prism position measurements |
Gerardo Moreno et al. |
Suspensions
Installation
|
31 Mar 2011 |
D1000017-v3 |
Fibre storage rack - inner cross rib |
Marielle van Veggel et al. |
Preliminary Design
Suspensions
|
21 Mar 2011 |
D1000018-v3 |
Fibre storage rack - horizontal tie bar |
Marielle van Veggel et al. |
Suspensions
Preliminary Design
|
21 Mar 2011 |
D1000016-v3 |
Fibre storage rack - inner rib |
Marielle van Veggel et al. |
Suspensions
Preliminary Design
|
21 Mar 2011 |
D1000015-v3 |
Fibre storage rack - long side rib |
Marielle van Veggel et al. |
Suspensions
Preliminary Design
|
21 Mar 2011 |
D1000014-v3 |
Fibre storage rack - Cross rib |
Marielle van Veggel et al. |
Suspensions
Preliminary Design
|
21 Mar 2011 |
D1000012-v3 |
Fibre storage rack - horizontal rail side 2 |
Marielle van Veggel et al. |
Suspensions
Preliminary Design
|
21 Mar 2011 |
D1000011-v3 |
Fibre storage rack - horizontal rail side 1 |
Marielle van Veggel et al. |
Preliminary Design
Suspensions
|
21 Mar 2011 |
D1000009-v3 |
Fibre storage rack - baseplate |
Marielle van Veggel et al. |
Preliminary Design
Suspensions
|
21 Mar 2011 |
G1100166-v3 |
Hydroxide catalysis bonding for aLIGO, eaLIGO and beyond |
Marielle van Veggel |
Suspensions
Meeting
|
16 Mar 2011 |
D1002152-v1 |
aLIGO BS/FM Prism holder assembly |
Marielle van Veggel et al. |
Suspensions
Installation
|
09 Mar 2011 |
D1002150-x0 |
aLIGO BS/FM Prism bonding alignment guide |
Marielle van Veggel et al. |
Suspensions
Installation
|
09 Mar 2011 |
D1002146-v1 |
aLIGO TCP/ERM Prism holder |
Marielle van Veggel et al. |
Installation
Suspensions
|
09 Mar 2011 |
D1002142-v2 |
aLIGO TCP Prism bonding baseplate |
Marielle van Veggel et al. |
Installation
Suspensions
|
09 Mar 2011 |
D1002141-v2 |
aLIGO TCP Prism bonding fixture |
Marielle van Veggel et al. |
Suspensions
Installation
|
09 Mar 2011 |
D1002144-v1 |
aLIGO TCP Prism bonding support cylinder |
Marielle van Veggel et al. |
Suspensions
Installation
|
09 Mar 2011 |
D1002143-v1 |
aLIGO TCP Prism bonding alignment guide |
Marielle van Veggel et al. |
Installation
Suspensions
|
09 Mar 2011 |
D1002140-v2 |
aLIGO TCP Prism bonding jig |
Marielle van Veggel et al. |
Installation
Suspensions
|
09 Mar 2011 |
D1002203-v2 |
aLIGO ERM Prism bonding baseplate |
Marielle van Veggel et al. |
Suspensions
Installation
|
09 Mar 2011 |
D1002145-v1 |
aLIGO TCP/ERM Prism holder assembly |
Marielle van Veggel et al. |
Installation
Suspensions
|
09 Mar 2011 |
D1002288-v1 |
aLIGO ERM prism bonding support cylinder |
Marielle van Veggel et al. |
Suspensions
Final Design
|
09 Mar 2011 |
D1002202-v2 |
aLIGO ERM Prism bonding fixture |
Marielle van Veggel et al. |
Installation
Suspensions
|
09 Mar 2011 |
D1002201-v2 |
aLIGO ERM Prism bonding jig |
Marielle van Veggel et al. |
Suspensions
Installation
|
09 Mar 2011 |
D0900373-v2 |
ALIGO SUS ETM/ITM Monolithic Assembly_Advanced Welding Hub |
Giles Hammond et al. |
Basic R&D
Suspensions
Installation
|
08 Mar 2011 |
D1002291-v1 |
aLIGO TCP/ERM Prism holder fixing screw |
Marielle van Veggel et al. |
Installation
Suspensions
|
21 Oct 2010 |
D1002290-v1 |
aLIGO TCP/ERM Prism holder alignment bush |
Marielle van Veggel et al. |
Installation
Suspensions
|
21 Oct 2010 |
D1002289-v1 |
aLIGO TCP/ERM Prism holder alignment screw |
Marielle van Veggel et al. |
Suspensions
Installation
|
21 Oct 2010 |
T1000016-v1 |
ALIGO NP-type: - Preparations of Ear Bonding at LASTI (February 2010) |
Marielle van Veggel et al. |
Suspensions
Installation
|
12 Oct 2010 |
D1001685-v1 |
V-block - assembly |
Marielle van Veggel |
Suspensions
Installation
|
21 Sep 2010 |
E1000273-v1 |
Design document for PM wire break-off prisms |
Ken Strain et al. |
Final Design
Suspensions
|
02 Sep 2010 |
D1000013-v3 |
Fibre storage rack - fibre support crossbar |
Marielle van Veggel et al. |
Preliminary Design
Suspensions
|
01 Sep 2010 |
D1000019-v3 |
Fibre storage rack - fibre support peg |
Marielle van Veggel et al. |
Preliminary Design
Suspensions
|
01 Sep 2010 |
T1000472-v1 |
Technical Design Document of the fibre guard in the aLIGO ETM/ITM quad suspension |
Marielle van Veggel et al. |
Installation
Suspensions
|
26 Aug 2010 |
T0900586-v1 |
Proof load test and vertical bounce frequency test apparatus for ITM/ETM silica suspension fibres |
Ken Strain et al. |
Suspensions
Final Design
|
26 Aug 2010 |
T1000464-v1 |
De-Bonding Experiments on Samples Cured for up to Forty-Eight Hours |
Marielle van Veggel |
Basic R&D
|
04 Aug 2010 |
T080245-v1 |
ALIGO NP-type: - Report on bonding Viton stops, magnet holders and break-off prisms at LASTI |
Russell Jones et al. |
Subsystem Test
Suspensions
|
13 Jul 2010 |
D1000008-v3 |
Fibre storage rack |
Giles Hammond et al. |
Preliminary Design
Suspensions
|
18 May 2010 |
D1000010-v3 |
Fibre storage rack - vertical support |
Marielle van Veggel et al. |
Preliminary Design
Suspensions
|
18 May 2010 |
F1000013-v1 |
Ear quality control sheets |
Marielle van Veggel |
Fabrication
Suspensions
|
27 Apr 2010 |
G1000436-v3 |
Progress monolithic suspension work Glasgow and MIT since April 2009 |
Giles Hammond et al. |
Meeting
Suspensions
Reviews
|
16 Apr 2010 |
F1000006-v1 |
Bond quality monitoring form |
Marielle van Veggel |
Final Design
Suspensions
|
14 Apr 2010 |
T1000114-v1 |
ALIGO NP-type: - Ear Bonding at LASTI - February 2010 |
Gerardo Moreno et al. |
Suspensions
Installation
|
15 Mar 2010 |
D1000129-x0 |
Assembly of the bonding jig with prism holder on the ETM/ITM penultimate mass |
Marielle van Veggel |
Suspensions
Preliminary Design
|
25 Jan 2010 |
T0900629-v2 |
Response to questions from the review panel on the Final Design Review of the ETM/ITM ears |
Giles Hammond et al. |
Suspensions
Final Design
|
17 Dec 2009 |
G0900652-v2 |
Gravitational wave detectors - broadening their horizon |
Marielle van Veggel |
Detector
|
08 Jul 2009 |
T0900278-v2 |
ALIGO NP-type: Preparations and hazard analysis for test hangs at LASTI in July/August 2009 |
Giles Hammond et al. |
Suspensions
System Test
|
02 Jul 2009 |
G0900586-v1 |
Flame welding tests for monolithic suspensions of the mirrors of future GW interferometers. |
Giles Hammond et al. |
Suspensions
Basic R&D
|
19 Jun 2009 |
G0900507-v2 |
Overview of monolithic suspension work for Advanced LIGO |
Timothy Bodiya et al. |
Basic R&D
Suspensions
|
19 Jun 2009 |
G0900583-v1 |
Properties of hydroxy-catalysis bonds for use in advanced gravitational wave detectors |
Karen Haughian et al. |
Basic R&D
|
19 Jun 2009 |
T0900203-v2 |
Assembly procedure of monolithic part of the suspension for advanced LIGO |
Giles Hammond et al. |
Preliminary Design
|
09 Jun 2009 |
T0900211-x0 |
Welding tests at Glasgow (5-8 May 2009) |
Marielle van Veggel et al. |
Suspensions
Final Design
|
06 May 2009 |
T080326-v1 |
A Strategy to Prove and Provide Monolithic Suspensions |
Giles Hammond et al. |
Suspensions
|
20 Feb 2009 |
T080152-x0 |
Questions preliminary design review of silica masses for advanced LIGO |
Mark Barton et al. |
Document Migration
|
20 Jun 2008 |
T080091-x0 |
Proposal for baseline change from ribbons to fibres in AdvLIGO test mass suspension monolithic stage |
Mark Barton et al. |
Document Migration
|
21 Apr 2008 |
G080220-x0 |
Update on Bonding Ears and Prisms to the Test Masses for LASTI - LSC/Virgo Collaborations Meeting @ Caltech, March 17-20, 2008 |
Helena Armandula et al. |
Document Migration
|
04 Apr 2008 |
T080041-x0 |
ALIGO NP-type - Report on prism bonding at LASTI on 11th -17th February 2008 |
Helena Armandula et al. |
Document Migration
|
26 Feb 2008 |
T080023-x0 |
Test prism glueing on disc insert plates |
Helena Armandula et al. |
Document Migration
|
26 Feb 2008 |
T080020-x0 |
ALIGO NP-Type: Preparations of prism bonding at LASTI on 11th - 17th February 2008 |
Helena Armandula et al. |
Document Migration
|
26 Feb 2008 |
T080006-x0 |
Laboratory layout during ear bonding at LASTI |
Helena Armandula et al. |
Document Migration
|
17 Jan 2008 |
T070305-x0 |
ALIGO NP-Type: Report on Ear Bonding at LASTI on 10th -14th December 2007 |
Helena Armandula et al. |
Document Migration
|
16 Jan 2008 |
T070298-x0 |
ALIGO NP-Type: Preparations of Ear Bonding at LASTI on 10th -14th December 2007 |
Helena Armandula et al. |
Document Migration
|
06 Dec 2007 |
G070733-x0 |
Bonding Ears on the Penultimate Mass and Test Mass at LASTI - LSC/Virgo Collaborations Meeting, October 22-25 2007, Hannover Germany |
Marielle van Veggel |
Document Migration
|
30 Oct 2007 |